Grundy

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to November 15, 2024.

Existingdescribed as
AEPzone
34.5 kVkV as printed
3mentions

Also printed as: Grundy station

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline B3295 Cancellation
B3295
Cancelled $0.8M 6/1/2025 Not printed 2024-11-15
SRRTEP Western
Buchanan County, Virginia
AEP-2022-AP040 · s3211.1-.7
Conceptual $38.12 M 5/1/2028 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 69
Buchanan County, Virginia “Remove 34.5 kV circuit breaker “D” and 34.5 KV circuit breaker “C” at Grundy station”
34.5 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 3
AEP Transmission Zone: Baseline B3295 Cancellation “Grundy 34.5 kV: Install a 34.5 kV 9.6 MVAR cap bank.”
34.5 kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 69
Buchanan County, Virginia “Remove 34.5 kV circuit breaker “D” and 34.5 KV circuit breaker “C” at Grundy station”
34.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.