Arroyo Junction

Named in 3 PJM planning documents for 1 project, from December 13, 2024 to October 8, 2025.

Existingdescribed as
APSzone
138 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Arroyo - East Liverpool – Wylie Ridge 138 kV Switch
APS-2024-119 · s3647.1
Not printed $1.1 M 05/09/2025 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ARROYO; ARROYO JUNCTION; EAST LIVERPOOL; SOUTH CHESTER TAP; WYLIE RIDGE → ARROYO; EAST LIVERPOOL; WYLIE RIDGE 2024-12-13 2025-03-14
Substations named ARROYO; EAST LIVERPOOL; WYLIE RIDGE → ARROYO JUNCTION; EAST LIVERPOOL; SOUTH CHESTER TAP; WYLIE RIDGE 2025-03-14 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2025 RTEP p. 37
Arroyo - East Liverpool – Wylie Ridge 138 kV Switch “Replace 2-pole structure 212-81 at Arroyo Junction”
138 kV
2025-10-08 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2025 p. 37
Arroyo - East Liverpool – Wylie Ridge 138 kV Switch “Replace 2-pole structure 212-81 at Arroyo Junction”
138 kV
2024-12-13 SRRTEP Western
Item 15 - APS Supplemental Project p. 7
Arroyo - East Liverpool – Wylie Ridge 138 kV Switch No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.