Spangler
Named in 8 PJM planning documents for 4 projects, from October 17, 2024 to October 6, 2026.
Existingdescribed as
PENELECzone
46 kVkV as printed
10mentions
Also printed as: Spangler Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Spangler Substation PN-2024-003 · s3747.1 |
Not printed | $14.2M | 7/12/2027 | Not printed | 2026-10-06 TEAC |
| Glory – Nanty Glo – Spangler 46 kV Line PN-2024-022 · s3981.1 |
Not printed | $13.81M | 06/30/2028 | Not printed | 2026-10-06 TEAC |
| Glory – Nanty Glo – Spangler 46 kV Switches PN-2024-026 |
Conceptual | $1.86 M | 11/13/2026 | Not printed | 2025-02-13 SRRTEP Mid-Atlantic |
| Glory - Nanty Glo - Spangler 46 kV N Line Switches, PA PN-2026-007 |
Not printed | Not printed | Not printed | Not printed | 2026-06-16 SRRTEP Mid-Atlantic |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | BOBIK LANE; GLORY; MOSS CREEK; NANTY GLO; NICKTOWN; SPANGLER; STRONGSTOWN; TEAKETTLE → BOBIK LANE; GLORY; NANTY GLO; SPANGLER; STRONGSTOWN | 2025-12-11 | 2026-10-06 |
| Substations named | GLORY; MOSS CREEK; NANTY GLO; NICKTOWN; SPANGLER; TEAKETTLE → NICKTOWN | 2026-06-16 | 2026-09-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 17 |
Spangler Substation | “At Spangler:
§ Convert the 46 kV yard into a five-breaker ring bus.” 46 kV |
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 23 |
Glory – Nanty Glo – Spangler 46 kV Line | “At Spangler Substation: Replace line relaying” 46 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic Penelec local plan submission for 2026 RTEP p. 16 |
Spangler Substation | “Spangler Substation is currently configured as a 46 kV straight bus” 46 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic Penelec local plan submission for 2026 RTEP p. 23 |
Glory – Nanty Glo – Spangler 46 kV Line | “At Spangler Substation: Replace line relaying” |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2025 RTEP p. 17 |
Glory – Nanty Glo – Spangler 46 kV Switches | No role wording 46 kV |
| 2026-06-16 | SRRTEP Mid-Atlantic Item 04 - Penelec Supplemental Projects p. 5 |
Glory - Nanty Glo - Spangler 46 kV N Line Switches, PA | No role wording 46 kV |
| 2025-12-11 | SRRTEP Mid-Atlantic Item 10 - PENELEC Supplemental Projects p. 8 |
Glory – Nanty Glo – Spangler 46 kV Line | “At Spangler Substation: Replace line relaying” 46 kV |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 7 |
Spangler Substation | “Convert the 46 kV yard into a five-breaker ring bus” 46 kV |
| 2025-02-13 | SRRTEP Mid-Atlantic Item 03 - Penelec Supplemental Projects p. 3 |
Glory – Nanty Glo – Spangler 46 kV Switches | No role wording 46 kV |
| 2024-10-17 | SRRTEP Mid-Atlantic Item 06 - Penelec Supplemental Projects p. 3 |
Glory – Nanty Glo – Spangler 46 kV Switches | No role wording 46 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.