Back Fork

Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to September 18, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
4mentions

Also printed as: Back Fork Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Projects
APS-2024-039, APS-2024-041 to APS-2024-045, APS-2024-048 to APS-2024-051
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relay Projects
APS-2024-098 to 105, APS-2024-111 to 114, APS-2024-116, APS-2024-118
Not printed Not printed Not printed Not printed 2024-12-13
SRRTEP Western
Misoperation Relays
APS-2024-113
Conceptual $2.35 M 12/31/2028 Not printed 2026-09-18
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ANTIETAM; BACK FORK; BEDINGTON; CANAAN VALLEY; COWEN; CRUPPERNECK; DOUBLE TOLL GATE; EAST HAGERSTOWN; GLENVILLE; GREENWOOD; NIPETOWN; PARAMOUNT; REDBUD; REID; RINGGOLD; SENECA CAVERNS; SHAFFERS CORNER; SHAFFERS CORNERS; SPRINGDALE; WESTON; WILLIAM → ANTIETAM; BACK FORK; BEDINGTON; CANAAN VALLEY; COWEN; CRUPPERNECK; DOUBLE TOLL GATE; EAST HAGERSTOWN; GLENVILLE; GREENWOOD; NIPETOWN; PARAMOUNT; REDBUD; REID; RINGGOLD; SENECA CAVERNS; SHAFFERS CORNER; SPRINGDALE; WESTON; WILLIAM 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-18 SRRTEP Western
Item 01 - APS Supplemental Projects p. 11
Misoperation Relays “At Back Fork Substation: Replace relays, and limiting substation conductor”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 127
Misoperation Relay Projects “replace circuit breaker, disconnect switches, line trap, substation conductor and relaying”
138 kV
2024-12-13 SRRTEP Western
Item 15 - APS Supplemental Project p. 6
Misoperation Relay Projects No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 127
Misoperation Relay Projects “At Back Fork, replace circuit breaker, disconnect switches, line trap, substation conductor and relaying.”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this