Substation Scout

Tiffany

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to May 14, 2026.

Existingdescribed as
PENELECzone
115 kVkV as printed
3mentions

Also printed as: Tiffany 115 kV Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Tiffany – Thompson 115 kV Misoperation Relays
PN-2023-014 · s3409.1
Not printed $ 0.47M 11/07/2022 Not printed 2024-10-08
TEAC
Goudey – Tiffany/Warriner Pond 115 kV LG2 Line, PA
PN-2026-005
Not printed Not printed Not printed Not printed 2026-05-14
SRRTEP Mid-Atlantic

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 32
Tiffany – Thompson 115 kV Misoperation Relays “Replace relays, breakers, disconnect switches, and substation conductor at Tiffany 115 kV Substation”
115 kV
2026-05-14 SRRTEP Mid-Atlantic
Item 07 - Penelec Supplemental Projects p. 3
Goudey – Tiffany/Warriner Pond 115 kV LG2 Line, PA No role wording
115 kV
2024-10-08 TEAC
Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 32
Tiffany – Thompson 115 kV Misoperation Relays “Replace relays, breakers, disconnect switches, and substation conductor at Tiffany 115 kV Substation”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this