McDonald Steel

Named in 3 PJM planning documents for 1 project, from January 16, 2026 to October 6, 2026.

Not stateddescribed as
AMPTzone
138 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Transmission Zone M3 Process Niles Central 138 kV substation
AMPT-2025-005 · s3888.1 (AMPT) & s3888.2 (ATSI)
Engineering $14.1M 08/01/2028 63 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named MCDONALD STEEL; NILES; NILES CENTRAL → NILES CENTRAL Not reported Not reported
Substations named NILES CENTRAL → MCDONALD STEEL; NILES; NILES CENTRAL 2026-10-06 Not reported
Substations named NILES CENTRAL → MCDONALD STEEL; NILES; NILES CENTRAL 2025-06-13 2026-01-16
Substations named MCDONALD STEEL; NILES; NILES CENTRAL → NILES CENTRAL 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 11
AMPT Transmission Zone M3 Process Niles Central 138 kV substation No role wording
138 kV
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2026 RTEP p. 11
AMPT Transmission Zone M3 Process Niles Central 138 kV substation No role wording
138 kV
2026-01-16 SRRTEP Western
Item 02 - AMPT Supplemental Projects p. 6
AMPT Transmission Zone M3 Process Niles Central 138 kV substation No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.