Substation Scout

East Wooster

Named in 3 PJM planning documents for 1 project, from September 19, 2025 to October 6, 2026.

Existingdescribed as
AMPTzone
138kVkV as printed
3mentions

Also printed as: East Wooster sub · East Wooster substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH
AMPT-2023-004 · s3832.1 (AMPT), s3832.2 (ATSI), s3832.3 (AMPT), s3832.4 (AMPT), s3832.5 (AMPT), s3832.6 (AEP)
Engineering $68.741M 8/30/2030 60 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $71.7 M → $68.741M 2025-09-19 2026-10-06
In-service date AMPT portion (10/2028); FE portion (08/2030); AEP portion (10/2028) → 8/30/2030 2025-09-19 2026-10-06
Status unknown (Engineering (AMPT), Conceptual (AEP and FE)) → engineering (Engineering) 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE 2026-10-06 Not reported
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT Not reported Not reported
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; STAR CLOVERDALE → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; POWER PLANT; STAR Not reported Not reported
Substations named APPLE AVE; APPLE AVE SUBS; E WOOSTER; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS 2025-09-19 2026-10-06
Substations named APPLE AVE; EAST WOOSTER; MINERAL SPRINGS → APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR 2026-10-06 2026-10-06
Substations named APPLE AVE; CLOVERDALE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT; STAR → APPLE AVE; EAST WOOSTER; MINERAL SPRINGS; NEW FE; POWER PLANT 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 7
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH “AEP to replace revenue metering at E Wooster”
138kV
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2026 RTEP p. 8
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH “AEP to replace revenue metering at E Wooster”
138kV
2025-09-19 SRRTEP Western
Item 01 - AMPT Supplemental Projects p. 3
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH No role wording
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this