Substation Scout

Breinigsville

Named in 2 PJM planning documents for 1 project, on October 8, 2025.

Existingdescribed as
PPLzone
500-138-69kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Hamilton, PA
PPL-2024-0006 · s3556
Conceptual $9 M 06/01/2027 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ATTR; BREINIGSVILLE; TEK PARK → BREINIGSVILLE; TEK PARK 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 19
Hamilton, PA “Install two new line terminals in the Breinigsville 69/138kV Yard.”
500-138-69kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 19
Hamilton, PA “existing Breinigsville 500-138-69kV Substation”
500-138-69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.