Substation Scout

Hanover

Named in 2 PJM planning documents for 2 projects, on November 14, 2024.

Existingdescribed as
UGIzone
66kVkV as printed
2mentions

Also printed as: Hanover Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
UGI-2022-0001 Engineering $6M 11/2025 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
UGI Transmission Zone: Supplemental Project
UGI-2023-0001
Engineering $20M October 2026 Not printed 2024-11-14
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date October 2026 → 09/30/2026 2024-11-14 2026-10-06
Substations named HANOVER; PALOOKA; PLYMOUTH → PALOOKA; PLYMOUTH 2024-11-14 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
UGI local plan submission for 2024 RTEP p. 3
UGI-2022-0001 “Construct a 66kV high side bus at Hanover Substation”
66kV
2024-11-14 SRRTEP Mid-Atlantic
Item 02 - UGI Supplemental Projects p. 4
UGI Transmission Zone: Supplemental Project No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this