Roberts

Named in 6 PJM planning documents for 8 projects, from October 8, 2024 to November 14, 2025.

Existingdescribed as
AEPzone
138 kV, 138kV, 345 kVkV as printed
9mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Kenny - Roberts 138kV Relay Upgrades
b3891.1
Not printed $0.4M 4/1/2029 Not printed 2024-11-15
SRRTEP Western
Roberts-Wilson 138kV line “in & out” of Milepost 138kV
b3955.1
Not printed $12.17 M 06/01/2030 Not printed 2025-11-14
SRRTEP Western
Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement
b3962.1
Not printed $0.85M 6/1/2030 Not printed 2025-11-14
SRRTEP Western
AEP Transmission Zone: Baseline Kenny - Roberts 138kV Relay Upgrades Not printed $0.4M 4/1/2029 Not printed 2024-10-18
SRRTEP Western
Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement Not printed $0.85M 6/1/2030 Not printed 2025-10-17
SRRTEP Western
Roberts-Wilson 138kV line “in & out” of Milepost 138kV Not printed $12.17 M 06/01/2030 Not printed 2025-10-17
SRRTEP Western
Dublin & Hilliard, OH
AEP-2021-OH049, AEP-2022-OH024, AEP-2022-OH035, AEP-2023-OH041 · s3441.1-.7
Conceptual $143.7M 12/01/2026 461 MW 2026-09-08*
SRRTEP Western
Columbus, OH
AEP-2023-OH047 · s3213.1-.6
Engineering $12.05 M 04/15/2024 33.5 MVA 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date Jerome (1/30/2025, partially), Celtic (11/13/2025) → 12/01/2026 2024-12-13 Not reported
In-service date 12/01/2026 → Jerome (1/30/2025, partially), Celtic (11/13/2025) 2024-10-08 2024-12-13
Status engineering (Engineering) → conceptual (Scoping) 2024-12-13 Not reported
Status conceptual (Scoping) → engineering (Engineering) 2024-10-08 2024-12-13
Substations named AMLIN; CELTIC; HAYDEN; HYATT; JEROME; KILEVILLE → AMLIN; BEACON; BEATTY; BOLTON; CELTIC; COSGRAY; DUBLIN; HALL; HAYDEN; HYATT; JEROME; KILEVILLE; ROBERTS; SAWMILL; WILSON 2024-12-13 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 116
Dublin & Hilliard, OH No role wording
345 kV
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2024 RTEP p. 73
Columbus, OH “Remote end work to accommodate the above work at Cole, Roberts, & Trabue”
138 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 43
Roberts-Wilson 138kV line “in & out” of Milepost 138kV No role wording
138kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 77
Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement “Replace the 2 overdutied Roberts 138 kV circuit breakers “CB-H014F2 and CB-H014F5" with 63 kVA circuit breakers.”
138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 37
Roberts-Wilson 138kV line “in & out” of Milepost 138kV No role wording
138kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 72
Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement “Roberts 138 kV Breakers “CB-H014F2 and CB-H014F5” Replacement”
138 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 44
AEP Transmission Zone: Baseline Kenny - Roberts 138kV Relay Upgrades No role wording
138 kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 43
AEP Transmission Zone: Baseline Kenny - Roberts 138kV Relay Upgrades No role wording
138 kV
2024-10-08 TEAC
Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 73
Columbus, OH “Remote end work to accommodate the above work at Cole, Roberts, & Trabue”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.