Callender Gap

Named in 7 PJM planning documents for 5 projects, from June 5, 2025 to October 6, 2026.

Newdescribed as
PPLzone
230kVkV as printed
11mentions

Described as new: “Install a four bay BAAH 230kV switchyard” — source, page 15

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Callender Gap, PA
PPL-2025-0005
Conceptual $73.5 M 05/30/2028 500 MW 2026-10-06
TEAC
Big Bass, PA
PPL-2025-0012
Conceptual $186.875 M 05/30/2028 1,500 MW 2026-10-06
TEAC
Lackawana, PA
PPL-2025-0013
Conceptual $74.9 M 07/30/2028 1,400 MW 2026-10-06
TEAC
Archbald Mountain, PA
PPL-2025-0014
Conceptual $220 M 05/30/2028 1,000 MW 2026-02-03
TEAC
Callender Gap, PA
PPL-2026-0002
Conceptual $76.5 M 05/30/2029 1,200 MW 2026-05-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/2027 → 05/30/2028 2025-05-06 2025-06-05
Substations named CALLENDER GAP; HOPATCONG; LACKAWANNA; PAUPACK → CALLENDER GAP; LACKAWANNA; PAUPACK 2025-06-05 2026-10-06
In-service date 05/2027 → 05/30/2028 2025-07-08 2025-09-09
In-service date 07/2028 → 07/30/2028 2025-09-09 2025-10-08
In-service date 05/2027 → 05/30/2028 2025-09-09 2026-02-03
In-service date 5/2028 → 05/30/2029 2026-03-10 2026-05-08

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 15
Callender Gap, PA “Install a four bay BAAH 230kV switchyard”
230kV
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 23
Lackawana, PA No role wording
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 27
Big Bass, PA No role wording
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 15
Callender Gap, PA “Install a four bay BAAH 230kV switchyard”
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 23
Lackawana, PA No role wording
230kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 27
Big Bass, PA No role wording
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 10
Callender Gap, PA “Install four new 230kV line terminals for the Customer lead lines at Callender Gap 230kV yard”
230kV
2026-02-03 TEAC
Item 07 - PPL Supplemental Projects p. 7
Archbald Mountain, PA “Install 230kV terminals for three 230kV lines”
230kV
2025-10-08 TEAC
Item 09 - PPL Supplemental Projects p. 4
Lackawana, PA No role wording
230kV
2025-09-09 TEAC
Item 09 - PPL Supplemental Projects p. 10
Big Bass, PA “Upgrade Lackawanna - Callender Gap 230kV Line”
230kV
2025-06-05 TEAC
Item 05 - PPL Supplemental Projects p. 4
Callender Gap, PA “Install a four bay BAAH 230kV switchyard”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.