Substation Scout

Beaver

Named in 12 PJM planning documents for 8 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
ATSIzone
138 kV, 345 / 138 / 13.2 kV, 345 kV, 345-138-13.2 kV, 345/138 kVkV as printed
12mentions

Also printed as: Beaver Substation

PJM interconnection queue

A PJM queue substation page has the same name: Beaver (OH) — 7 queue requests filed, 6 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cluster 2 (ATSI)
b3925.1
Not printed $217.32M 6/1/2029 Not printed 2025-01-07
TEAC
Cluster 2 (ATSI) Not printed $217.32M 6/1/2029 Not printed 2024-12-03
TEAC
Cluster 2 (ATSI) Not printed Not printed Not printed Not printed 2024-11-06
TEAC
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations Not printed 265.1 Not printed Not printed 2024-11-19
TEAC
Beaver No. 1 345/138 kV Transformer
ATSI-2018-004 (s1757) · s1757
Not printed 10.0 M 4/23/2029 Not printed 2025-10-08
TEAC
ATSI Transmission Zone M-3 Process West Lorain Plant Separation
ATSI-2022-012 · s3497.1
Not printed $3.56M 12/1/2025 Not printed 2024-10-08
TEAC
Beaver No. 2 345/138 kV Transformer
ATSI-2024-033
Conceptual $29.56 M 12/14/2029 Not printed 2026-10-06
TEAC
Beaver - Henrietta 138 kV Line
ATSI-2026-049
Conceptual $0.96 M 12/31/2027 Not printed 2026-08-14
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$12.7M → 10.0 M Not reported Not reported
Cost estimate
prior value printed on the same page
$12.7M → 10.0 M 2024-10-08 2024-10-08
Cost estimate
prior value printed on the same page
$12.7M → 10.0 M 2025-10-08 2025-10-08
Substations named BEAVER → BEAVER; WEST LORAIN GENERATION 2025-10-08 Not reported
Substations named BEAVER; HENRIETTA → BEAVER; BRIGHTON TAP; HENRIETTA; WELLINGTON 2026-07-17 2026-08-14

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 06 - ATSI Supplemental Projects - Presentation p. 8
Beaver No. 2 345/138 kV Transformer “Replace Beaver No. 2 345/138 kV Transformer”
345/138 kV
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2024 RTEP p. 70
ATSI Transmission Zone M-3 Process West Lorain Plant Separation “Install revenue metering equipment on the 138 kV tie line at Beaver”
345-138-13.2 kV
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2025 RTEP p. 20
Beaver No. 1 345/138 kV Transformer “Beaver Substation – Terminal equipment to be replaced include: ▪ Replace disconnect switches, VT’s, CCVT’s, and associated relaying.”
345/138 kV
2026-08-14 SRRTEP Western
Item 02 - ATSI Supplemental Projects p. 11
Beaver - Henrietta 138 kV Line No role wording
138 kV
2026-07-17 SRRTEP Western
Item 03 - ATSI Supplemental Projects p. 7
Beaver - Henrietta 138 kV Line No role wording
138 kV
2025-10-08 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 20
Beaver No. 1 345/138 kV Transformer “Beaver Substation – Terminal equipment to be replaced include: § Replace disconnect switches, VT’s, CCVT’s, and associated relaying.”
345/138 kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 51
Cluster 2 (ATSI) No role wording
138 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 72
Cluster 2 (ATSI) No role wording
138 kV
2024-11-19 TEAC
Item 1 - Reliability Analysis Update p. 32
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations “Upgrade terminal equipment at Beaver, Davis Besse & Bayshore 345 kV substation”
345 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 58
Cluster 2 (ATSI) “Swap 345 kV line terminals at Beaver 345 kV substation”
345 kV
2024-10-08 TEAC
Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 70
ATSI Transmission Zone M-3 Process West Lorain Plant Separation “Install revenue metering equipment on the 138 kV tie line at Beaver”
345-138-13.2 kV
2024-10-08 TEAC
Item 05 - ATSI Supplemental Projects p. 4
Beaver No. 1 345/138 kV Transformer “Beaver Substation – Terminal equipment to be replaced include:”
345 / 138 / 13.2 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.