Substation Scout

Limaburg

Named in 4 PJM planning documents for 1 project, from February 14, 2025 to October 8, 2025.

Existingdescribed as
DEOKzone
—kV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Turfway
DEOK-2024-004 · s3600.1
Conceptual $13M 07/25/2029 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $15.8M → $13M 2025-11-14 Not reported
Cost estimate
prior value printed on the same page
$13M → $15.8M 2025-11-14 2025-11-14
Cost estimate $13M → $15.8M 2025-10-08 2025-11-14
In-service date 07/26/2028 → 07/25/2029 2025-11-14 Not reported
In-service date 07-25-2029 → 07/25/2029 2025-03-14 2025-10-08
In-service date 07/25/2029 → 07/26/2028 2025-10-08 2025-11-14
Substations named AERO; CONSTANCE; LIMABURG; OAKBROOK; TURFWAY → AERO; CONSTANCE; DONALDSON; LIMABURG; OAKBROOK; TURFWAY; WOODSPOINT 2025-02-14 2025-03-14

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
DEOK local plan submission of the supplemental projects for 2025 RTEP p. 6
Turfway “Feeders at nearby substations Limaburg, Oakbrook, Aero and Constance are expected to see a 30% load increase”
2025-10-08 TEAC
Informational Only - DEOK Local Plan Submission of the Supplemental Projects for 2025 p. 6
Turfway No role wording
2025-03-14 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 5
Turfway No role wording
2025-02-14 SRRTEP Western
Item 06 - DEOK Supplemental Projects p. 5
Turfway No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.