Substation Scout

Windsor

Named in 12 PJM planning documents for 10 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
JCPLzone
230 kV, 230 – 34.5 kV, 230-34.5 kV, 34.5 kV, 34.5kVkV as printed
16mentions

Also printed as: Windsor Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations
b3737.27
Not printed Not printed 6/1/2029 Not printed 2026-05-08
TEAC
Windsor 34.5kV CB Replacements: KQ, Q143, B-25, B-22, B-31, B-34, B-19, B-28, B-16, BK4, B-7, B-8, B-54, B-51
b3986.1
Not printed $8.4M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Great Adventure 34.5 kV Substation
b4017.2
Not printed $61.68 M 6/1/2030 Not printed 2025-11-13
SRRTEP Mid-Atlantic
Great Adventure 34.5 kV Substation Not printed $61.68 M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Windsor 34.5kV CB Replacements: KQ, Q143, B-25, B-22, B-31, B-34, B-19, B-28, B-16, BK4, B-7, B-8, B-54, B-51 Not printed $8.4M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Windsor Substation
JCPL-2023-005 · s3394.1
Not printed $6.3M 11/2/2023 Not printed 2024-10-08
TEAC
JCPL Transmission Zone M-3 Process Windsor No. 3 230-34.5 kV Transformer
JCPL-2024-020 · s3615.1
Not printed $9.7M 12/22/2028 Not printed 2025-10-08
TEAC
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection
JCPL-2024-034 · S3621.1
Conceptual $8.49 M 02/10/2031 96 MVA 2026-09-17
SRRTEP Mid-Atlantic
Cookstown- Windsor 34.5 kV H60 Line, NJ
JCPL-2026-021
Not printed Not printed Not printed Not printed 2026-06-16
SRRTEP Mid-Atlantic
Wyckoff Street Substation
JCPL-2026-050
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $8.49 M → $54M 2026-09-17 Not reported
Cost estimate $54M → $8.49 M 2025-10-08 2026-09-17
In-service date 02/10/2031 → 7/24/2027 2026-09-17 Not reported
In-service date 7/24/2027 → 02/10/2031 2025-10-08 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects Presentation p. 5
Wyckoff Street Substation No role wording
34.5 kV
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 4
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection “Install three new 34.5 kV breakers at Windsor Substation”
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 11
JCPL Transmission Zone M-3 Process Windsor No. 3 230-34.5 kV Transformer No role wording
230-34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 27
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection “Install three new 34.5 kV breakers at Windsor Substation”
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 77
Windsor Substation “Replace the 230 – 34.5 kV No. 1 Transformer at Windsor”
230 – 34.5 kV
2026-06-16 SRRTEP Mid-Atlantic
Item 02 - JCPL Supplemental Projects p. 6
Cookstown- Windsor 34.5 kV H60 Line, NJ No role wording
34.5 kV
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 28
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations “Upgrade terminal equipment at Windsor 230 kV”
230 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 30
Great Adventure 34.5 kV Substation “Upgrade line relaying at Windsor Substation”
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 38
Windsor 34.5kV CB Replacements: KQ, Q143, B-25, B-22, B-31, B-34, B-19, B-28, B-16, BK4, B-7, B-8, B-54, B-51 “Replace 14 Windsor 34.5kV breakers”
34.5kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 30
Great Adventure 34.5 kV Substation “Upgrade line relaying at Windsor and Van Hiseville Substations”
34.5 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 38
Windsor 34.5kV CB Replacements: KQ, Q143, B-25, B-22, B-31, B-34, B-19, B-28, B-16, BK4, B-7, B-8, B-54, B-51 “Replace 14 Windsor 34.5kV breakers”
34.5kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 11
JCPL Transmission Zone M-3 Process Windsor No. 3 230-34.5 kV Transformer “Replace the Windsor No. 3 230-34.5 kV Transformer with a larger unit.”
230-34.5 kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 27
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection “Install three new 34.5 kV breakers at Windsor Substation”
34.5 kV
2024-12-03 TEAC
Item 05 - JCPL Supplemental Projects p. 7
JCPL Transmission Zone M-3 Process Windsor No. 3 230-34.5 kV Transformer “Replace the Windsor No. 3 230-34.5 kV Transformer with a larger unit.”
230-34.5 kV
2024-10-17 SRRTEP Mid-Atlantic
Item 04 - JCPL Supplemental Projects p. 6
JCPL Transmission Zone M-3 Process Windsor – Wyckoff Street 34.5 kV M65 Line Customer Connection “Install three new 34.5 kV breakers at Windsor Substation”
34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 76
Windsor Substation “The 230 – 34.5 kV No. 1 Transformer at Windsor was manufactured in 1973 and is approaching end of life.”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this