Bellevue

Named in 5 PJM planning documents for 3 projects, from March 14, 2025 to November 14, 2025.

Existingdescribed as
ATSIzone
69 kVkV as printed
5mentions

Also printed as: Bellevue Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Bellevue-Groton 69 kV Line
b3980.1
Not printed $10.1M 06/01/2030 Not printed 2025-11-14
SRRTEP Western
Bellevue-Groton 69 kV Line Not printed $10.1M 06/01/2030 Not printed 2025-10-17
SRRTEP Western
Bellevue-Groton 69 kV Line
ATSI-2023-013 · s3648
Not printed $10.1M 06/01/2026 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ATSI local plan submission of the supplemental projects for 2025 RTEP p. 40
Bellevue-Groton 69 kV Line “Bellevue Substation: Replace 6 manual switches with 2 GOAB switches, replace switch A98.”
69 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 17
Bellevue-Groton 69 kV Line “Bellevue Substation: • Replace (3) 69 kV disconnect switches”
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 11
Bellevue-Groton 69 kV Line “Bellevue Substation: • Replace (3) 69 kV disconnect switches”
69 kV
2025-10-08 TEAC
Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 40
Bellevue-Groton 69 kV Line “Bellevue Substation: Replace 6 manual switches with 2 GOAB switches”
69 kV
2025-03-14 SRRTEP Western
Item 05 - ATSI Supplemental Project p. 7
Bellevue-Groton 69 kV Line “Bellevue Substation : Replace 6 manual switches with 2 GOAB switches, replace switch A98. Revise relay settings, upgrade ACSR connections”