Atlantic
Named in 5 PJM planning documents for 4 projects, from October 8, 2024 to October 6, 2026.
Also printed as: Atlantic Substation
PJM interconnection queue
A PJM queue substation page has the same name: Atlantic (NJ) — 4 queue requests filed, 0 active.
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| JCPL Transmission Zone: NJ SAA Baseline Project Cancelations b3737.2 |
Not printed | Not printed | 6/1/2029 | Not printed | 2026-05-08 TEAC |
| Atlantic – Red Bank S1033 230 kV Misoperation Relays JCPL-2019-008 · s3411.1 |
Not printed | $ 2.0 M | 04/17/2026 | Not printed | 2024-10-08 TEAC |
| Atlantic – Red Bank T2020 230 kV Misoperation Relays JCPL-2019-009 · s3412.1 |
Not printed | $ 2.0 M | 11/20/2026 | Not printed | 2024-10-08 TEAC |
| Atlantic – Long Branch 34.5 kV P42 Line Customer Connection JCPL-2024-044 · s3782.1 |
Not printed | $8.1 M | 04/01/2027 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ATLANTIC; RED BANK SUBSTATIONS → ATLANTIC; RED BANK | 2024-10-08 | Not reported |
| Substations named | ATLANTIC; EATON CREST; RED BANK SUBSTATIONS → ATLANTIC; EATON CREST; RED BANK | 2024-10-08 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 17 |
Atlantic – Long Branch 34.5 kV P42 Line Customer Connection | “Modify relay settings at Atlantic Substation and Long Branch Substation” 34.5 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic JCPL local plan submission for 2026 RTEP p. 17 |
Atlantic – Long Branch 34.5 kV P42 Line Customer Connection | “Modify relay settings at Atlantic Substation and Long Branch Substation.” |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 87 |
Atlantic – Red Bank S1033 230 kV Misoperation Relays | “Replace relaying and limiting substation conductor at Atlantic and Red
Bank 230 kV Substations” 230 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic JCPL local plan submission for 2024 RTEP p. 88 |
Atlantic – Red Bank T2020 230 kV Misoperation Relays | “Replace relaying at Atlantic and Red Bank 230 kV substations” 230 kV |
| 2026-05-08 | TEAC Item 10 - Reliability Analysis Update p. 25 |
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations | “Atlantic 230 kV Substation - Convert to double-breaker double-bus” 230 kV |
| 2024-10-08 | TEAC Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 87 |
Atlantic – Red Bank S1033 230 kV Misoperation Relays | “Replace relaying and limiting substation conductor at Atlantic and Red
Bank 230 kV Substations” 230 kV |
| 2024-10-08 | TEAC Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 88 |
Atlantic – Red Bank T2020 230 kV Misoperation Relays | “Replace relaying at Atlantic and Red Bank 230 kV substations” 230 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.