Niles Valley
Named in 5 PJM planning documents for 3 projects, from October 8, 2024 to October 6, 2026.
Existingdescribed as
PENELECzone
115 kVkV as printed
6mentions
Also printed as: Niles Valley Substation · Niles Valley 115 kV substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Niles Valley 115 kV Ring Bus s3290 |
Engineering | $16.0M | 4/28/2028 | approximately 30 MW | 2025-11-13 SRRTEP Mid-Atlantic |
| Niles Valley – Wellsboro 115 kV PN-2022-002 · s2835 |
Not printed | $1.0 M | 6/1/2024 | 23 MW | 2026-09-08* SRRTEP Mid-Atlantic |
| Niles Valley 115 kV Ring Bus PN-2023-005 · s3290.1 |
Not printed | $16.0M | 4/28/2028 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 11/04/2028 → 4/28/2028 | Not reported | Not reported |
| In-service date | 4/28/2028 → 11/04/2028 | 2026-10-06 | Not reported |
| In-service date | 11/04/2028 → 4/28/2028 | 2024-10-08 | 2026-10-06 |
| Substations named | HECTOR; MANSFIELD; NILES VALLEY; OSCEOLA; SABINSVILLE; WELLSBORO → NILES VALLEY; OSCEOLA | Not reported | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 5 |
Niles Valley 115 kV Ring Bus | “Niles Valley 115 kV Substation
§ Construct a six breaker ring bus” 115 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic Penelec local plan submission for 2026 RTEP p. 5 |
Niles Valley 115 kV Ring Bus | “Construct a six breaker ring bus” 115 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 12 |
Niles Valley 115 kV Ring Bus | “At Niles Valley Substation:
Construct a 115 kV, six breaker ring bus” 115 kV |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 41 |
Niles Valley – Wellsboro 115 kV | “bus outage of the East most 115 kV bus at Niles Valley would outage all load and customers” 115 kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 05 - Penelec Supplemental Projects p. 9 |
Niles Valley 115 kV Ring Bus | “Construct a six breaker ring bus” 115 kV |
| 2024-10-08 | TEAC Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 11 |
Niles Valley 115 kV Ring Bus | “At Niles Valley Substation:
§ Construct a 115 kV, six breaker ring bus” 115 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.