Cavett
Named in 4 PJM planning documents for 3 projects, from October 8, 2024 to November 15, 2024.
Not stateddescribed as
AEPzone
69 kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| AEP Transmission Zone: Baseline
Haviland Station Upgrades b3883.1 |
Not printed | $0.8M | 4/1/2029 | Not printed | 2024-11-15 SRRTEP Western |
| AEP Transmission Zone: Baseline Haviland Station Upgrades | Not printed | $0.8M | 4/1/2029 | Not printed | 2024-10-18 SRRTEP Western |
| Van Wert, Ohio AEP-2023-OH043 · s3212.1-.2 |
Engineering | 4.11M | 12/01/2024 | Not printed | 2024-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western AEP local plan submission of the supplemental projects for 2024 RTEP p. 71 |
Van Wert, Ohio | No role wording 69 kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 36 |
AEP Transmission Zone: Baseline Haviland Station Upgrades | No role wording 69 kV |
| 2024-10-18 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 35 |
AEP Transmission Zone: Baseline Haviland Station Upgrades | No role wording 69 kV |
| 2024-10-08 | TEAC Informational Only - AEP Local Plan submission of supplemental projects 2024 p. 71 |
Van Wert, Ohio | No role wording 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.