Named in 8 PJM planning documents for 7 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
JCPLzone
230 kV, 34.5 kVkV as printed
12mentions

Also printed as: Freneau Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations
b3737.2
Not printed Not printed 6/1/2029 Not printed 2026-05-08
TEAC
Automatic Restoration Projects
JCPL-2023-009 · s3235.1
Not printed $3.78 12/31/2024 Not printed 2024-10-08
TEAC
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays
JCPL-2023-048 · s3255.1
Not printed $4.1M 05/30/2025 Not printed 2024-10-08
TEAC
New Customer Connection
JCPL-2023-058 · s3259.1
Not printed $1.3M 06/01/2024 Not printed 2024-10-08
TEAC
EH Werner- Freneau- Keyport 34.5 kV E31 Line
JCPL-2024-012 · s3965.1
Not printed $22.50 M 05/11/2029 Not printed 2026-10-06
TEAC
Jerseyville - Smithburg 34.5 kV X752 Line
JCPL-2026-024
Not printed Not printed Not printed Not printed 2026-09-17
SRRTEP Mid-Atlantic
Taylor Lane Substation
JCPL-2026-048
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FRENEAU; PARLIN SUBSTATIONS; WILLIAMS GAS → FRENEAU; PARLIN; WILLIAMS GAS 2024-10-08 Not reported
Substations named CHEESEQUAKE; FRENEAU → CHEESEQUAKE; FRENEAU; RARITAN RIVER 2024-10-08 Not reported
Substations named EH WERNER; FRENEAU; KEYPORT → FRENEAU; KEYPORT 2026-10-06 Not reported
Substations named CLARK STREET; EH WERNER; FELTUS ST; FRENEAU; KEYPORT; LAURENCE HARBOR → EH WERNER; FRENEAU; KEYPORT 2026-03-18 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects Presentation p. 3
Taylor Lane Substation No role wording
34.5 kV
2026-10-06 TEAC
Informational Only - JCPL Local Plan Submission of Supplemental Projects for 2026 p. 28
EH Werner- Freneau- Keyport 34.5 kV E31 Line “Replace limiting sub conductor at Freneau and Keyport substations”
34.5 kV
2026-10-01* SRRTEP Mid-Atlantic
JCPL local plan submission for 2026 RTEP p. 30
EH Werner- Freneau- Keyport 34.5 kV E31 Line “Replace limiting sub conductor at Freneau and Keyport substations.”
2026-09-17 SRRTEP Mid-Atlantic
Item 01 - JCPL Supplemental Projects p. 7
Jerseyville - Smithburg 34.5 kV X752 Line No role wording
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 13
Automatic Restoration Projects “At Freneau, replace relaying”
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 25
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays “Replace relaying and limiting substation conductor at Freneau, Williams Gas and Parlin substations”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 33
New Customer Connection “Install one SCADA controlled line switch toward Freneau Substation”
34.5 kV
2026-05-08 TEAC
Item 10 - Reliability Analysis Update p. 25
JCPL Transmission Zone: NJ SAA Baseline Project Cancelations “Freneau Substation - Update relay settings”
2026-03-18 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects p. 9
EH Werner- Freneau- Keyport 34.5 kV E31 Line “Replace limiting sub conductor at Freneau and Keyport substations.”
34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 13
Automatic Restoration Projects “At Freneau, replace relaying”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 25
Freneau-Williams Gas-Parlin 230 kV Misoperation Relays “Replace relaying and limiting substation conductor at Freneau, Williams Gas and Parlin substations”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 33
New Customer Connection No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this