Mt. Zion Substation

Named in 4 PJM planning documents for 1 project, from November 6, 2024 to October 8, 2025.

Existingdescribed as
PEPCOzone
230 kVkV as printed
4mentions

Also printed as: Mt Zion · Mt Zion Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Mt. Zion
PEP-2024-003 · s3572.1, s3572.2, s3572.3, s3572.4
Engineering $22M 6/1/2030 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PEPCO local plan submission for 2025 RTEP p. 3
Mt. Zion “Mt. Zion Substation contains multiple 230 kV networked elements”
230 kV
2025-10-08 TEAC
Informational Only - PEPCO Local Plan Submission of the Supplemental Projects for 2025 p. 3
Mt. Zion “Mt. Zion Substation contains multiple 230 kV networked elements”
230 kV
2025-01-07 TEAC
Item 08 - PEPCO Supplemental Projects p. 3
Mt. Zion “Mt. Zion Substation contains multiple 230 kV networked elements”
230 kV
2024-11-06 TEAC
Item 10 - PEPCO Supplemental Projects p. 3
Mt. Zion No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.