Ashtabula

Named in 3 PJM planning documents for 1 project, from August 5, 2025 to October 8, 2025.

Existingdescribed as
PENELECzone
345 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Perry – Ashtabula – Erie West 345 kV Line
PN-2023-029 · s3702.1
Not printed $52.4 M 5/31/2027 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$38.7M → $52.4 M 2025-08-05 2025-08-05
Substations named ASHTABULA; ERIE WEST → ASHTABULA; ERIE WEST; PERRY 2025-10-08 Not reported
Substations named ASHTABULA; ERIE WEST; PERRY → ASHTABULA; ERIE WEST 2025-08-05 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2025 RTEP p. 6
Perry – Ashtabula – Erie West 345 kV Line “At Ashtabula: ▪ Revise relay settings”
345 kV
2025-10-08 TEAC
Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 8
Perry – Ashtabula – Erie West 345 kV Line “At Ashtabula: § Revise relay settings”
2025-08-05 TEAC
Item 06 - Penelec Supplemental Projects p. 3
Perry – Ashtabula – Erie West 345 kV Line “At Ashtabula: § Revise relay settings”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.