Named in 2 PJM planning documents for 1 project, on March 13, 2025.

Existingdescribed as
PSEGzone
69kVkV as printed
2mentions

Also printed as: Stanley Terrace substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Kenilworth Data Center, NJ
PSEG-2024-0007
Conceptual $66.8M 06/01/2029 60 MW 2025-03-13
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 06/01/2029 → 06/2029 2025-03-13 Not reported
In-service date 06/2026 → 06/01/2029 2024-12-12 2025-03-13
Status conceptual (Conceptual) → engineering (Engineering and Planning) 2025-03-13 Not reported
Substations named GALLOPING HILL; ROSELLE; SPRINGFIELD ROAD; STANLEY TERRACE; VAUXHALL → GALLOPING HILL; ROSELLE; STANLEY TERRACE 2025-03-13 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2025 RTEP p. 11
Kenilworth Data Center, NJ “Construct a new 69kV circuit from the new customer substation to Stanley Terrace substation.”
69kV
2025-03-13 SRRTEP Mid-Atlantic
Item 02 - PSEG Supplemental Projects p. 4
Kenilworth Data Center, NJ “Construct a new 69kV circuit from the new customer substation to Stanley Terrace substation.”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.