Elderberry station

Named in 3 PJM planning documents for 1 project, from October 8, 2024 to October 8, 2025.

Existingdescribed as
AEPzone
—kV as printed
3mentions

Also printed as: Elderberry

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201
AEP-2023-IM023 · s3588.1-.7
Conceptual $184.977M 12/15/2026 1100MW 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$155.69 M → $184.977M 2024-10-08 2024-10-08
Substations named DUMONT; ELDERBERRY; KENZIE CREEK; LARRISON DRIVE; NEW PRAIRIE; OLIVE; SORENSON; THOMSON → DUMONT; ELDERBERRY; LARRISON DRIVE; NEW PRAIRIE; OLIVE; SORENSON 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AEP local plan submission of the supplemental projects for 2025 RTEP p. 12
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 “Remote end settings work at Elderberry station”
2025-10-08 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2025 p. 12
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 “Remote end settings work at Elderberry station”
2024-10-08 TEAC
Item 06 - AEP Supplemental Projects p. 6
AEP Transmission Zone M-3 Process Project Amazing Sites 100 and 201 “Remote end settings work at Elderberry station”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.