Warren

Named in 11 PJM planning documents for 6 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
PENELECzone
115 kV, 115kV, 230 kVkV as printed
13mentions

Also printed as: Warren Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Warren 115kV Breaker “NO.1 XFMR” Replacement
b3988.1
Cancelled $0.957M Not printed Not printed 2026-02-12
SRRTEP Mid-Atlantic
Warren – Falconer 115 kV Line: New Customer
s3291.1
Engineering $8.45M 04/28/2028 Not printed 2025-05-15
SRRTEP Mid-Atlantic
Warren 115kV Breaker “NO.1 XFMR” Replacement Not printed $0.957M 6/1/2030 Not printed 2025-10-16
SRRTEP Mid-Atlantic
Erie South Substation
PN-2020-005 and PN-2023-018
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Warren – Falconer 115 kV Line – New Customer
PN-2023-007 · s3291.1
Not printed $8.45M 04/28/2028 Not printed 2026-10-06
TEAC
Glade Substation
PN-2024-013 · s3631.1
Not printed $12 M 12/17/2027 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$1.5M → $8.45M 2025-05-15 2025-05-15
Cost estimate
prior value printed on the same page
$1.5M → $8.45M Not reported Not reported
Cost estimate $1.5M → $8.45M Not reported Not reported
Cost estimate $8.45M → $1.5M 2026-10-06 Not reported
Cost estimate
prior value printed on the same page
$1.5M → $8.45M 2026-10-06 2026-10-06
Cost estimate $1.5M → $8.45M 2024-10-08 2026-10-06
In-service date 04/28/2027 → 04/28/2028 Not reported Not reported
In-service date 04/28/2028 → 04/28/2027 2026-10-06 Not reported
In-service date 04/28/2027 → 04/28/2028 2024-10-08 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 7
Warren – Falconer 115 kV Line – New Customer “Adjust relay settings at Warren Substation”
115 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 7
Warren – Falconer 115 kV Line – New Customer “Adjust relay settings at Warren Substation”
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2025 RTEP p. 16
Glade Substation “At Warren Substation, on the Glade line terminal: ▪ Replace substation conductor. ▪ Install new relaying and control equipment.”
230 kV
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 15
Warren – Falconer 115 kV Line – New Customer “Adjust relay settings at Warren Substation”
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 37
Erie South Substation No role wording
230 kV
2026-02-12 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3
Warren 115kV Breaker “NO.1 XFMR” Replacement “Replace the over dutied Warren 115 kV circuit breakers”
115 kV
2025-11-13 SRRTEP Mid-Atlantic
Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 40
Warren 115kV Breaker “NO.1 XFMR” Replacement “Replace the over dutied Warren 115 kV circuit breakers”
115 kV
2025-10-16 SRRTEP Mid-Atlantic
Item 02 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 40
Warren 115kV Breaker “NO.1 XFMR” Replacement “Replace the over dutied Warren 115 kV circuit breakers”
115kV
2025-10-08 TEAC
Informational Only - Penelec Local Plan Submission of the Supplemental Projects for 2025 p. 16
Glade Substation “At Warren Substation, on the Glade line terminal: § Replace substation conductor.”
2025-05-15 SRRTEP Mid-Atlantic
Item 02 - Penelec Supplemental Projects p. 3
Warren – Falconer 115 kV Line: New Customer “Adjust relay settings at Warren Substation”
115 kV
2025-03-04 TEAC
Item 07 - Penelec Supplemental Projects p. 4
Glade Substation “At Warren Substation, on the Glade line terminal: -Replace substation conductor”
2024-10-08 TEAC
Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 15
Warren – Falconer 115 kV Line – New Customer “Adjust relay settings at Warren Substation”
115 kV
2024-10-08 TEAC
Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 37
Erie South Substation No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.