Named in 5 PJM planning documents for 2 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
APSzone
138 kV, 138kVkV as printed
5mentions

Also printed as: Gordon Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Gordon – Nyswaner 138kV Line
APS-2024-055 · s3939.1
Not printed $30.12M 12/29/2028 Not printed 2026-10-06
TEAC
Misoperation Relay Projects
APS-2024-062 to APS-2024-068
Not printed Not printed Not printed Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named GORDON; MANIFOLD; NYSWANER; PERRYMAN → GORDON; NYSWANER 2026-05-15 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 67
Gordon – Nyswaner 138kV Line “Rebuild the 7.6 miles of the wood section of Gordon - Nyswaner 138 kV Line from Nyswaner Substation south to Gordon Substation”
138 kV
2026-09-28* SRRTEP Western
APS local plan submission of the supplemental projects for 2026 RTEP p. 67
Gordon – Nyswaner 138kV Line “south to Gordon Substation.”
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 132
Misoperation Relay Projects “replace circuit breaker, disconnect switches, substation conductor and relaying”
138 kV
2026-05-15 SRRTEP Western
Item 03 - APS Supplemental Projects p. 9
Gordon – Nyswaner 138kV Line No role wording
138kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 132
Misoperation Relay Projects “At Gordon, replace circuit breaker, disconnect switches, substation conductor and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.