Dubois

Named in 5 PJM planning documents for 2 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
PENELECzone
115 kVkV as printed
5mentions

Also printed as: Dubois 115 kV substation

PJM interconnection queue

A PJM queue substation page has the same name: Dubois (PA) — 2 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dubois - Harvey Run - Whetstone 115 kV Line Rehab
PN-2018-001 · s1769
Not printed $39.3M 6/29/2030 Not printed 2026-10-06
TEAC
Dubois – Whetstone 115 kV Misoperation Relays
PN-2023-015 · s3410.1
Not printed $2.1M 11/29/2023 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$5.3M → $39.3M Not reported Not reported
Cost estimate
prior value printed on the same page
$5.3M → $39.3M 2026-07-17 2026-07-17
Cost estimate
prior value printed on the same page
$5.3M → $39.3M 2026-10-06 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 3
Dubois - Harvey Run - Whetstone 115 kV Line Rehab “Dubois 115 kV Substation – Terminal equipment to be replaced includes:”
115 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 3
Dubois - Harvey Run - Whetstone 115 kV Line Rehab “Dubois 115 kV Substation – Terminal equipment to be replaced”
115 kV
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2024 RTEP p. 33
Dubois – Whetstone 115 kV Misoperation Relays “Replace substation conductor, wave trap, line tuners, disconnect switch, breaker, and relaying at Dubois 115 kV substation”
115 kV
2026-07-17 SRRTEP Mid-Atlantic
Item 04 - Penelec Supplemental Projects p. 4
Dubois - Harvey Run - Whetstone 115 kV Line Rehab “Dubois 115 kV Substation – Terminal equipment to be replaced includes”
115 kV
2024-10-08 TEAC
Informational Only - PENELEC Local Plan submission of supplemental project 2024 p. 33
Dubois – Whetstone 115 kV Misoperation Relays “Replace substation conductor, wave trap, line tuners, disconnect switch, breaker, and relaying at Dubois 115 kV substation”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this