Substation Scout

Shepherdsville

Named in 1 PJM planning document for 1 project, on Not reported.

Existingdescribed as
EKPCzone
69-12.5 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
West Shepherdsville
EKPC-2023-013 · s3171.0
Engineering $0.0M 12/23/2025 Not printed 2026-09-08*
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named WEST SHEPHERDSVILLE → BROOKS; BROOKS SOUTH; BULLITT COUNTY; CEDAR GROVE INDUSTRIAL; NELSON COUNTY; SHEPHERDSVILLE; WEST SHEPHERDSVILLE 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
EKPC local plan submission of the supplemental projects for 2024 RTEP p. 16
West Shepherdsville “from the existing Shepherdsville substation tap.”
69-12.5 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this