Substation Scout

Social Hall Substation

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to April 15, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
3mentions

Also printed as: Social Hall

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Ethel Springs – Bethlen 138 kV Network
APS-2023-009 · s3096.1
Not printed $59.6M 12/31/2025 14.43 MW 2024-10-08
TEAC
Saltsburg 138 kV Substation
APS-2026-009
Not printed Not printed Not printed 11 MW 2026-04-15
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 35
Ethel Springs – Bethlen 138 kV Network “At Social Hall Substation:  Replace substation conductor, wave trap, and circuit breaker”
138 kV
2026-04-15 SRRTEP Western
Item 02 - APS Supplemental Project p. 4
Saltsburg 138 kV Substation No role wording
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 35
Ethel Springs – Bethlen 138 kV Network “At Social Hall Substation: § Replace substation conductor, wave trap, and circuit breaker”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this