Substation Scout

Kexon

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to May 15, 2026.

Existingdescribed as
AMPTzone
69 kV, 69kVkV as printed
3mentions

Also printed as: Kexon Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Pioneer, OH
AMPT-2022-002 · s3117.1 (AMPT); s3117.2 (AMPT), s3117.3 (AMPT), s3117.4 (ATSI); s3117.5 (ATSI), s3117.6 (ATSI)
Not printed $26.5 M 5/31/2027 8 MW 2024-10-08
TEAC
Kexon Tap-Kidston-Chase Brass 69 kV line
AMPT-2026-004
Not printed Not printed Not printed Not printed 2026-05-15
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $26.5 M → $12.6 M Not reported Not reported
Cost estimate $12.6 M → $26.5 M 2024-10-08 Not reported
Cost estimate $26.5 M → $12.6 M 2024-10-08 2024-10-08
Substations named EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER → E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER Not reported Not reported
Substations named E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER → EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER 2024-10-08 Not reported
Substations named EAST FAYETTE; KEXON; KIDSTON; PIONEER; SNYDER; STRYKER → E FAYETTE; KEXON; PIONEER; SNYDER; STRYKER 2024-10-08 2024-10-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
AMPT local plan submission of the supplemental projects for 2024 RTEP p. 3
Pioneer, OH “At Kexon Substation - Install two (2) additional 69kV circuit breakers and associated substation disconnect switches”
69kV
2026-05-15 SRRTEP Western
Item 02 - AMPT Supplemental Projects p. 5
Kexon Tap-Kidston-Chase Brass 69 kV line No role wording
69 kV
2024-10-08 TEAC
Informational Only - AMPT Local Plan submission of supplemental project 2024 p. 3
Pioneer, OH “At Kexon Substation - Install two (2) additional 69kV circuit breakers”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this