Frostburg No. 1 Substation

Named in 1 PJM planning document for 1 project, on September 18, 2026.

Existingdescribed as
APSzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relays
APS-2025-014
Conceptual $3.72 M 12/31/2030 Not printed 2026-09-18
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FINZEL; FROSTBURG; RIDGELEY → FINZEL; FROSTBURG NO 1; RIDGELEY 2025-04-11 2026-09-18

Every mention

DateDocumentProjectWhat the document says about it
2026-09-18 SRRTEP Western
Item 01 - APS Supplemental Projects p. 15
Misoperation Relays “At Frostburg No. 1 Substation: replace disconnect switches, CVTs and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.