Substation Scout

Finneywood

Named in 2 PJM planning documents for 3 projects, on October 8, 2024.

Existingdescribed as
DOMzone
500/230kVkV as printed
6mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Tunstall 230kV Delivery - DEV
DOM-2022-0028 · s3022
Engineering $140.0M 08/01/2025 77.0 MW 2024-10-08
TEAC
Jeffress 230kV Delivery - MEC
DOM-2022-0032 · s3061
Engineering $120.0 M 07/01/2026 (Stage 2) 100 MW 2024-10-08
TEAC
Allen Creek 230kV Delivery - DEV
DOM-2023-0052 · s3511.1
Conceptual $30.0 M 12/30/2025 100 MW 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 07/01/2026 (Stage 2) → 07/01/2026 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Southern
Dominion p. 170
Allen Creek 230kV Delivery - DEV “Line #2258 (Finneywood – Cloud)”
2026-09-08* SRRTEP Southern
Dominion p. 37
Tunstall 230kV Delivery - DEV No role wording
2026-09-08* SRRTEP Southern
Dominion p. 75
Jeffress 230kV Delivery - MEC No role wording
500/230kV
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 170
Allen Creek 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 37
Tunstall 230kV Delivery - DEV No role wording
2024-10-08 TEAC
Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 75
Jeffress 230kV Delivery - MEC No role wording
500/230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this