Substation Scout

Middleburg

Named in 3 PJM planning documents for 1 project, from November 14, 2024 to October 8, 2025.

Not stateddescribed as
PPLzone
69kVkV as printed
3mentions

PJM interconnection queue

A PJM queue substation page has the same name: Middleburg (PA) — 3 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Beavertown, PA
PPL-2019-0003 · s3554.1
Conceptual $33 M 05/31/2028 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BEAVERTOWN → BEAVERTOWN; MIDDLEBURG; SUNBURY 2024-10-17 2024-11-14

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 3
Beavertown, PA No role wording
69kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 3
Beavertown, PA No role wording
69kV
2024-11-14 SRRTEP Mid-Atlantic
Item 03 - PPL Supplemental Projects p. 7
Beavertown, PA No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this