Culpeper
Named in 4 PJM planning documents for 1 project, from October 8, 2024 to October 8, 2025.
Existingdescribed as
DOMzone
115kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Mountain Run 230kV Delivery - REC DOM-2022-0034 (Update) · s3680 |
Engineering | $60 M | Q4 2027 | 298 MW | 2025-10-08 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | Q4 2027 → 12/30/2025 | 2025-10-08 | Not reported |
| In-service date | 12/30/2025 → Q4 2027 | 2024-10-08 | 2025-02-04 |
| Substations named | CIRRUS; CULPEPER; KYSER; MOUNTAIN RUN; MOUNTAIN RUN 3; TECHNOLOGY → CIRRUS; CULPEPER; KYSER | 2025-10-08 | Not reported |
| Substations named | CIRRUS; CULPEPER; CULPEPER DP; KYSER; MOUNTAIN RUN DP → CIRRUS; CULPEPER; KYSER; MOUNTAIN RUN; MOUNTAIN RUN JUNCTION; TECHNOLOGY | 2024-10-08 | 2025-02-04 |
| Substations named | CIRRUS; CULPEPER; KYSER; MOUNTAIN RUN; MOUNTAIN RUN JUNCTION; TECHNOLOGY → CIRRUS; CULPEPER; KYSER; MOUNTAIN RUN; MOUNTAIN RUN 3; TECHNOLOGY | 2025-02-04 | 2025-10-08 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Southern Dominion p. 41 |
Mountain Run 230kV Delivery - REC | No role wording |
| 2025-10-08 | TEAC Informational Only - Dominion Local Plan Submission of the Supplemental Projects 2025 p. 39 |
Mountain Run 230kV Delivery - REC | “continue the 115kV service to Culpeper” 115kV |
| 2025-02-04 | TEAC Item 11 - Dominion Supplemental Projects p. 10 |
Mountain Run 230kV Delivery - REC | “continue the 115kV service to Culpeper” |
| 2024-10-08 | TEAC Informational Only - DOM Local Plan submission of supplemental projects 2024 p. 41 |
Mountain Run 230kV Delivery - REC | No role wording 115kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.