State Line

Named in 9 PJM planning documents for 6 projects, from November 6, 2024 to January 16, 2026.

Existingdescribed as
COMEDzone
138 kV, 345 kV, 345/138 kVkV as printed
9mentions

Also printed as: State Line substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
State Line 345/138 kV Transformer
b3943.1
Not printed $20.81 M 12/1/2030 Not printed 2025-11-14
SRRTEP Western
State Line 345/138 kV Transformer Not printed $20.81 M 12/1/2030 Not printed 2025-10-17
SRRTEP Western
Burnham 345kV BT12-13 CB
ComEd-2024-020 · s3587.1
Engineering $2.1M 12/31/26 Not printed 2025-10-08
TEAC
Customer in Chicago
ComEd-2025-020
Engineering $2.6 M 8/28/2026 179.4 MW 2025-10-17
SRRTEP Western
State Line 345 kV CBs
ComEd-2025-025
Conceptual $4M 12/31/2026 Not printed 2025-12-08
TEAC
NIPSCO Customer in Chicago
ComEd-2025-027
Engineering $ 0M 6/1/2027 260 MW 2026-01-16
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Status engineering (Engineering) → cancelled (Withdraw Need) 2026-01-16 2026-09-18

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
ComEd local plan submission of the supplemental projects for 2025 RTEP p. 23
Burnham 345kV BT12-13 CB No role wording
345 kV
2026-01-16 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 6
NIPSCO Customer in Chicago No role wording
138 kV
2025-12-08 TEAC
Item 09 - ComEd Supplemental Projects p. 5
State Line 345 kV CBs “State Line 345 kV BT oil circuit breakers BT 1-3 & BT 2-4 were installed in 1971”
345 kV
2025-11-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 21
State Line 345/138 kV Transformer “Install a new 345/138 kV transformer TR 84, and associated equipment at State Line substation.”
345/138 kV
2025-11-04 TEAC
Item 11 - ComEd Supplemental Projects p. 4
State Line 345 kV CBs “State Line 345 kV BT oil circuit breakers BT 1-3 & BT 2-4 were installed in 1971.”
345 kV
2025-10-17 SRRTEP Western
Item 05 - ComEd Supplemental Projects p. 8
Customer in Chicago “At State Line, install 2 new 138 kV CBs to create 2 line positions”
138 kV
2025-10-17 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 15
State Line 345/138 kV Transformer “associated equipment at State Line substation”
345/138 kV
2025-10-08 TEAC
Informational Only - ComEd Local Plan Submission of the Supplemental Projects for 2025 p. 23
Burnham 345kV BT12-13 CB No role wording
345 kV
2024-11-06 TEAC
Item 11 - ComEd Supplemental Projects p. 8
Burnham 345kV BT12-13 CB No role wording
345 kV