Whitings

Named in 5 PJM planning documents for 5 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
JCPLzone
230 kV, 230-34.5 kV, 34.5 kVkV as printed
7mentions

Also printed as: Whitings Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cookstown – Larrabee – Whitings 230 kV Line
JCPL-2022-005 · s3298.1, s3298.2, s3298.3, s3298.4, s3298.5
Not printed $50.4M 12/1/2024 Not printed 2024-10-08
TEAC
Automatic Restoration Projects
JCPL-2023-041 · s3251.1
Not printed $1.28 6/1/2025 Not printed 2024-10-08
TEAC
Manchester 230-34.5 kV Substation
JCPL-2026-001
Not printed Not printed Not printed 23 MW 2026-01-06
TEAC
Lakewood, NJ
JCPL-2026-026
Conceptual $292.4M 12/31/2032 Not printed 2026-07-07
TEAC
Whitings Substation
JCPL-2026-055
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named COOKSTOWN; LARRABEE; WHITINGS → COOKSTOWN; LARRABEE; MANCHESTER; WHITINGS 2024-10-08 Not reported
Substations named WHITINGS → MANITOU; WHITINGS 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects Presentation p. 9
Whitings Substation “The existing Whitings Substation #4 and #5 230-34.5 kV transformer bank low-side”
230-34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 15
Automatic Restoration Projects “At Whitings, replace relaying”
34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 59
Cookstown – Larrabee – Whitings 230 kV Line “At Whitings Substation: – Replace line trap”
230 kV
2026-07-07 TEAC
Item 07 - JCPL Supplemental Projects p. 11
Lakewood, NJ No role wording
230 kV
2026-01-06 TEAC
Item 03 - JCPL Supplemental Projects p. 3
Manchester 230-34.5 kV Substation No role wording
230 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 15
Automatic Restoration Projects “At Whitings, replace relaying”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 59
Cookstown – Larrabee – Whitings 230 kV Line “At Whitings Substation: – Replace line trap, substation conductor and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.