Latest mentions
Each row is one PJM document naming substations for one project, newest first. Showing the latest 200; earlier months are archived below. Atom feed
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2026-10-16 | SRRTEP Mid-Atlantic Item 01 - ACE Supplemental Projects Presentation p. 3 |
ACE-2026-004 | England Merion |
No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 02 - DPL Supplemental Projects Presentation p. 3 |
DPL-2026-004 | Brandywine | No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 02 - DPL Supplemental Projects Presentation p. 5 |
DPL-2026-002 | Carrcroft Edgemoor Silverside |
Status Engineering Cost $0.6 million In service 3/15/2027 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 02 - DPL Supplemental Projects Presentation p. 7 |
DPL-2026-003 | Oak Hall Tasley |
Status Engineering Cost $300k In service 10/30/2026 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 03 - PECO Supplemental Projects Presentation p. 3 |
PE-2026-016 | Plymouth | No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 03 - PECO Supplemental Projects Presentation p. 4 |
PE-2026-017 | Master | No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 03 - PECO Supplemental Projects Presentation p. 5 |
PE-2026-018 | Burholme Byberry |
No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 04 - BGE Supplemental Projects Presentation p. 3 |
Jennifer Rd to Cedar Park Wood Poles BGE-2025-008 |
Bestgate Cedar Park Jennifer Rd |
Status Engineering Cost $8.1M In service 12/31/2027 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 05 - DOM Supplemental Projects Presentation p. 4 |
Burlington Drive 115 kV DP – 3rd Feed - MEC DOM-2026-0029 |
Burlington Drive DP | Status Construction (Under construction) Cost $0.010 M In service 10/30/2026 Load approximately 30 MW |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 3 |
Taylor Lane Substation JCPL-2026-048 |
Freneau Keyport Laurel Avenue Red Bank Roberts Road Taylor Lane Substation |
No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 5 |
Wyckoff Street Substation JCPL-2026-050 |
Englishtown Windsor Wyckoff Street |
No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 7 |
West Wharton Substation JCPL-2026-053 |
West Wharton | No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 8 |
Melrose Substation JCPL-2026-054 |
EH Werner Melrose Substation Raritan River Substation |
No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 9 |
Whitings Substation JCPL-2026-055 |
Whitings | No figures printed |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects Presentation p. 11 |
New Providence Substation 34.5 kV Breaker Replacement JCPL-2025-009 |
Air Reduction Gillette Murray Hill New Providence |
Status Conceptual Cost $13.03 M In service 05/31/2030 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 07 - MetEd Supplemental Projects Presentation p. 3 |
Cly - Smith Street 115 kV Line - Customer Connection ME-2026-011 |
Cly Smith Street |
Status Conceptual Cost $2.25 M In service 06/01/2028 Load approximately 10 MW |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 08 - Penelec Supplemental Projects Presentation p. 3 |
Eagle Valley-Westfall 115 kV EVW Line Rebuild PN-2019-036 |
Eagle Valley Tyrone North Substation Westfall |
Status Conceptual Cost $51.69 M In service 06/14/2030 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects Presentation p. 3 |
POCO-JACK 69kV Improvements PPL-2026-0047 |
None named | In service 11/1/2029 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects Presentation p. 4 |
Penns Twin A Conversion PPL-2026-0051 |
Penns | In service 11/30/2030 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects Presentation p. 5 |
Twin Lakes Double Circuit PPL-2026-0052 |
None named | In service 5/30/2029 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects Presentation p. 6 |
McGovernville Twin A Conversion PPL-2026-0053 |
McGovernville | In service 11/30/2030 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects Presentation p. 7 |
Silver Spring Twin A Conversion PPL-2026-0054 |
Sliver Spring | In service 11/30/2029 |
| 2026-10-16 | SRRTEP Mid-Atlantic Item 09 - PPL Supplemental Projects Presentation p. 8 |
Roble Road MOS PPL-2026-0055 |
None named | In service 9/28/2029 Load 50MW |
| 2026-10-16 | SRRTEP Southern Item 05 - DOM Supplemental Projects Presentation p. 4 |
Burlington Drive 115 kV DP – 3rd Feed - MEC DOM-2026-0029 |
None named | Status Construction (Under construction) Cost $0.010 M In service 10/30/2026 Load 30 MW |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 3 |
Albright - Pruntytown 138 kV Line APS-2026-014 |
Albright Substation Kingwood Pruntytown Substation |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 5 |
Misoperation Relays APS-2026-074 |
North Franklin North Petersburg Substation Seneca Caverns |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 6 |
Misoperation Relays APS-2026-073 |
Cecil Crossgates Peters |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 7 |
Misoperation Relays APS-2026-053 |
Edinburg Strasburg |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 8 |
Misoperation Relays APS-2026-023 |
Black Oak Cumberland Short Gap |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 9 |
Misoperation Relays APS-2026-051 |
Bedington Opequon |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 10 |
New Customer Connection APS-2026-078 |
Bedington Reid |
In service 1/1/2028 Load approximately 200 MW |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 12 |
French Creek - Sutton 138 kV Line APS-2026-012 |
French Creek Sutton Substation |
Status Conceptual Cost $119.57 M In service 05/06/2033 |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 15 |
Belmont – Long Reach 138 kV Line APS-2024-093 |
Belmont Long Reach |
Status Conceptual Cost $76.11 M In service 11/27/2030 |
| 2026-10-16 | SRRTEP Western Item 01 - APS Supplemental Projects Presentation p. 18 |
Burma - Ridgway 138 kV Line APS-2026-007 |
Burma Clarion Substation Ridgway |
Status Conceptual Cost $24.55 M In service 06/22/2029 |
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 3 |
Carlisle-Shinrock 138 kV Line ATSI-2026-066 |
Carlisle Concast Birmingham Tap Shinrock |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 4 |
Clark-Greene 138 kV Line ATSI-2026-064 |
Clark Green Greene |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 6 |
Old Plank 69 kV Ring Bus ATSI-2019-070 |
Cascade Cedar Street Grant Street New Wilmington Old Plank Shenango Walmo |
Status Conceptual Cost $12.6 M In service 12/29/2028 |
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 9 |
Westgate Station 138 kV ATSI-2024-009 |
Allen Junction Substation Talmadge Westgate Station |
Status Conceptual Cost $3.8 M In service 05/26/2028 |
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 11 |
New Customer Connection ATSI-2026-059 |
Longview Ontario |
Status Conceptual Cost $1.57 M In service 06/26/2028 Load 10 MW |
| 2026-10-16 | SRRTEP Western Item 02 - ATSI Supplemental Projects Presentation p. 13 |
New Customer Connection ATSI-2026-061 |
Avon Dawg Pound New Eaton Ford Brookpark Substation Fowles Fox GM Cleveland (Parma) Grovewood Jim Brown New Nasa Pleasant Valley |
Status Conceptual Cost $13.78 M In service 11/29/2029 Load 60 MW |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 3 |
Reno Switch - Mill Creek 138 kV Line AEP-2026-OH040 |
Belmont Duck Creek Levee Mill Creek Reno SW Reno Switch |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 4 |
Nickel Distribution Delivery AEP-2026-OH036 |
Nickel New Sterling |
In service 12/2028 |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 5 |
Pittsburgh Avenue Station AEP-2026-OH038 |
Pittsburgh Avenue | No figures printed |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 6 |
Bolton Station Distribution Delivery AEP-2026-OH042 |
Bolton | In service Q3 2027 |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 7 |
Franklin Furnace Customer Delivery Point AEP-2026-OH043 |
None named | In service 3/31/2028 Load 20MW |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 8 |
Reedy Creek AEP-2026-AP008 |
Lovedale Orebank Reedy Creek Short Hills Wellmont |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 03 - AEP Supplemental Projects Presentation p. 11 |
Salamonie - Burr Oak 69 kV Line Solution AEP-2019-IM031, AEP-2022-IM019 |
Bluff Point Burr Oak Jay North Portland Portland Salamonie New |
Status Scoping (Conceptual) Cost $65.96 M In service 12/14/2029 |
| 2026-10-16 | SRRTEP Western Item 04 - ComEd Supplemental Projects Presentation p. 3 |
138KV L10301 Circuit Switcher ComEd-2026-014 |
Butterfield Glen Ellyn Tap |
Status Conceptual Cost $183.2K In service 12/31/2027 |
| 2026-10-16 | SRRTEP Western Item 04 - ComEd Supplemental Projects Presentation p. 5 |
138KV L14103 Transmission Switch ComEd-2026-015 |
Algonquin Tap North Huntley Tap |
Status Conceptual Cost $229.2K In service 12/31/2028 |
| 2026-10-16 | SRRTEP Western Item 04 - ComEd Supplemental Projects Presentation p. 7 |
Mendota ComEd-2026-016 |
Mendota | Status Conceptual Cost $4.85 M In service 6/1/2030 |
| 2026-10-16 | SRRTEP Western Item 04 - ComEd Supplemental Projects Presentation p. 9 |
Burnham ComEd-2026-017 |
Burnham | Status Construction (Under construction) Cost $1.4 M In service 11/13/26 |
| 2026-10-16 | SRRTEP Western Item 05 - DEOK Supplemental Projects Presentation p. 3 |
Liberty 69 kV Ring Bus DEOK-2026-005 |
Allen Liberty Shaker Run |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 05 - DEOK Supplemental Projects Presentation p. 4 |
US_PO_SH 69 kV Substation Retirement DEOK-2026-007 |
Allen Kemper US_PO_SH Xtek |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 05 - DEOK Supplemental Projects Presentation p. 5 |
Red Bank 138 kV Reliability Upgrade DEOK-2026-008 |
Red Bank | No figures printed |
| 2026-10-16 | SRRTEP Western Item 05 - DEOK Supplemental Projects Presentation p. 6 |
US_PO_SH 69 kV Substation Retirement DEOK-2026-010 |
US_PO_SH Wyscarver |
No figures printed |
| 2026-10-16 | SRRTEP Western Item 06 - EKPC Supplemental Projects Presentation p. 3 |
Eli, KY EKPC-2026-005 |
Salem | No figures printed |
| 2026-10-16 | SRRTEP Western Item 06 - EKPC Supplemental Projects Presentation p. 4 |
South Oak Hill EKPC-2026-006 |
South Oakhill | No figures printed |
| 2026-10-16 | SRRTEP Western Item 07 - EKPC Supplemental Projects Presentation p. 3 |
Eli, KY EKPC-2026-005 |
Salem | No figures printed |
| 2026-10-16 | SRRTEP Western Item 07 - EKPC Supplemental Projects Presentation p. 4 |
South Oak Hill EKPC-2026-006 |
South Oakhill | No figures printed |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 2 |
Round Top Substation ME-2023-020 · s3733.1 |
Allen Cly Gardners Round Top Substation Roundtop Substation |
Cost $22.1M In service 6/2/2028 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 4 |
South Reading Substation ME-2023-025 · s3742.1 |
South Reading Substation | Cost $20.4M In service 11/15/2027 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 6 |
Carlisle Pike – Gardners 115 kV 976 Line ME-2024-008 · s3743.1 |
Gardners | Cost $32.35M In service 12/21/2029 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 8 |
Willis Road 115 kV Substation ME-2023-002 · s3817.1 |
Smith Street Willis Road New |
Cost $25.00 M In service 12/31/2027 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 10 |
Cleona – Campbelltown 69kV Line ME-2023-009 · s3973.1 |
Campbelltown Substation | Cost $32.33 M In service 06/01/2028 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 12 |
Carpenter Technology Substation 69kV Circuit Breaker ME-2024-021 · s3974.1 |
Carpenter Technology Substation | Cost $1.01 M In service 06/15/2027 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 14 |
South Reading - West Reading 69 kV Line ME-2024-002 · s3975.1 |
South Reading Substation West Reading |
Cost $17.10M In service 12/29/2028 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 16 |
Muhlenberg 69 kV Substation ME-2024-005 · s3976.1 |
Carpenter Technology Substation Lucent Muhlenberg Substation North Temple |
Cost $29.29M In service 10/22/2027 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 18 |
Frystown – South Lebanon 69 kV Line ME-2024-022 · s3977.1 |
Frystown South Lebanon |
Cost $32.59M In service 12/14/2029 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 20 |
Foxhill 230 kV Ring Bus ME-2024-007 · s4015.1 |
Foxhill Substation Monroe Substation Shawnee Substation |
Cost $11.80M In service 12/21/2029 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 22 |
North Hanover 115 kV Breaker and a Half Substation ME-2024-012 · s4016.1 |
Gitts Run Hunterstown Jackson North Hanover |
Cost $36.79M In service 12/29/2028 |
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 24 |
Lincoln-Orrtanna 115 kV Customer Connection ME-2025-001 · s4017.1 |
Lincoln Substation Orrtanna Substation |
Cost $3.06M In service 04/08/2031 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 2 |
New Haven, Indiana AEP-2023-IM026 · s3750.1-4 |
Allen Zodiac New |
Status Scoping (Conceptual) Cost $169.1 M In service 07/01/2029 Load 1200MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 5 |
MISO Tranche 2 Projects AEP-2024-IM018 · s3608.1-7 |
Babcock Batesville Gwynneville New Madison County New Pike County New Sorenson Sullivan |
Status Scoping (Conceptual) Cost $0M In service 2032-2034 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 8 |
New Carlisle, IN AEP-2024-IM016 · s3763.1 |
Dumont Navistar New New Prairie |
Status Scoping (Conceptual) Cost $50.364 M In service 03/15/2027 Load 437MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 10 |
New Carlisle Customer Needs AEP-2023-IM020 · s3764.1-2 |
Creek Walker Edison Fillmore Road New Olive |
Status Scoping (Conceptual) Cost $30.463 M In service 05/09/2028 Load 90 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 12 |
Dowagiac, MI AEP-2024-IM011 · s3765.1 |
Hassle Switch New Kenzie Creek Valley |
Status Engineering Cost $3.719 M In service 12/01/2025 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 14 |
Sand Branch, WV AEP-2025-AP004 · s3825.1 |
Bradley Kanawha Pax Branch Sand Branch New |
Status Engineering Cost 0 In service 11/14/2025 Load 7.5 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 16 |
Pike County, KY AEP-2023-AP006 · s3826.1-3 |
Johns Creek Second Fork Simers New |
Status Engineering Cost $3.99 M In service 11/01/2025 Load 15 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 18 |
Aloe Vera SW, WV AEP-2025-AP003 · s3827.1 |
Aloe Vera SW New Baileysville Logan Switchback Trail Fork Stations |
Status Engineering Cost 0 In service 03/05/2026 Load 7MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 20 |
Elcona Tap, IN AEP-2025-IM003 · s3828.1-4 |
Dunlap East Elkhart Elcona |
Status Scoping (Conceptual) Cost $18.128 M In service 05/02/2029 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 22 |
Harrison, OH/Madison, OH AEP-2025-OH001 · s3829.1-4 |
Erin Hills Switch New Harrison Madison |
Status Engineering Cost $11.015 M In service 06/08/2029 Load 17.5 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 24 |
Greif, OH/Huntley, OH/Busch, OH/Lazelle, OH AEP-2025-OH003 · s3830.1 |
Busch Greif Huntley Lazelle |
Status Engineering Cost $15.7 M In service 03/03/2028 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 26 |
Windsor, OH AEP-2025-OH004 · s3831.1-3 |
Carrollton Krone Switch New Sunnyside |
Status Scoping (Conceptual) Cost $2.455 M In service 02/18/2027 Load 20 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 28 |
Don Marquis, OH/Monza, OH/Customer, OH AEP-2026-OH004 · s3864.1-6 |
Don Marquis Monza New |
Status Scoping (Conceptual) Cost $156.6 M In service 12/31/2027 Load 800 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 30 |
East Leipsic, OH AEP-2025-OH011 · s3837.1. |
East Leipsic | Status Engineering Cost $10.624 M In service 11/01/2027 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 32 |
Lockwood Rd., OH/Sowers, IN/South Hicksville, OH/Sowers, IN/Lockwood Rd., OH AEP-2022-OH028 · s3836.1-3. |
Lockwood Road Sowers |
Status Engineering Cost $36.008 M In service 04/26/2029 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 34 |
German, IN/Olive, IN/Notre Dame, IN AEP-2025-IM002 · s3838.1-3. |
German Notre Dame Olive |
Status Scoping (Conceptual) Cost $2.672 M In service 09/29/2028 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 36 |
Helium Switch, OH/Forest3, OH/Upper Sandusky, OH AEP-2025-OH009 · s3840.1-3. |
Forest Helium Switch New Upper Sandusky |
Status Engineering Cost $4.901 M In service 07/01/2026 Load 13.5MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 38 |
East Tiffin, OH/Mousey Switch, OH AEP-2025-OH024 · s3842.1. |
East Tiffin Mousey Switch West Rockaway |
Status Engineering Cost $19.174 M In service 05/01/2027 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 40 |
Cleveland, IN/Capital Ave, IN/East Elkhart, IN AEP-2025-IM006 · s3839.1-4. |
Capital Avenue Cleveland East Elkhart |
Status Scoping (Conceptual) Cost $7.067 M In service 12/31/2030 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 42 |
Abert, VA AEP-2025-AP007 · s3841.1. |
Abert | Status Scoping (Conceptual) Cost $3.4 M In service 11/16/2029 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 44 |
Jennings Road Switch, OH/Sharp Road, OH/Commerce, OH AEP-2024-OH028 · s3884.1-3. |
Commerce Jennings Road Switch Sharp Road |
Status Scoping (Conceptual) Cost $2.575 M In service 08/04/2027 Load 12.031 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 46 |
S2888 Scope Change AEP-2022-IM008 · S2888 |
Adams Berne |
Cost $19.45M In service 2/13/2029 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 47 |
North Haverhill, OH AEP-2022-OH002 · s3904.1. |
North Haverhill | Status Conceptual Cost $12.985 M In service 03/01/2027 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 49 |
Sancus Switch, OH AEP-2025-OH002 · s3905.1. |
Busch Lazelle Sancus Switch New |
Status Engineering Cost $4.44 M In service 12/28/2027 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 51 |
s3440.3 Scope Change AEP-2022-OH071 · s3440.1-.6 |
Beatty Bixby Cyprus Marion station Parsons Saint Clair Avenue Waverly |
Status Scoping (Conceptual) Cost $77.4M In service 06/05/2027 Load 675 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 53 |
Greenleaf, IN/Conant, IN/Elkhart Hydro, IN/Osolo, IN /Dunlap, IN/East Elkhart, IN/Wyland SS, IN /Middleton Run SS, IN/Middlebury, IN/Parkway, IN AEP-2023-IM003, AEP-2023-IM005 · s3906.1-13 |
Conant Dunlap East Elkhart Elkhart Hydro Greenleaf Middleton Run SS Osolo Wyland SS |
Status Scoping (Conceptual) Cost $20.647 M In service 09/01/2028 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 57 |
Beatty, OH/Cyprus, OH AEP-2026-OH001 · s3907.1-3 |
Beatty Bixby Cyprus |
Status Engineering Cost $5.218 M In service 09/01/2026 Load 675 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 59 |
West Moulton, OH/South Kossuth, OH AEP-2022-OH022 · s3908.1 |
Kossuth North Delphos West Moulton |
Status Engineering Cost $23.396 M In service 08/15/2029 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 61 |
Hannibal, OH AEP-2024-OH039 · s3762.1 |
Hannibal Kammer North Sub Station |
Status Scoping (Conceptual) Cost $0.392 M In service 07/17/2025 Load 200 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 63 |
Wayne County, WV AEP-2022-AP032 · s3952.1-3 |
East Lynn Lavalette Tri-State |
Status Scoping (Conceptual) Cost $98.8 M In service 11/28/2029 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 65 |
Illinois Road, IN/Gateway, IN AEP-2024-IM012 · s3953.1-2 |
Conrail SW New Gateway Illinois Road |
Status Engineering Cost $55.628 M In service 08/15/2030 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 67 |
Thelma, KY/Big Sandy, KY/Busseyville, KY AEP-2025-AP006 · s3954.1-4 |
Big Sandy Busseyville Thelma |
Status Scoping (Conceptual) Cost $169.555 M In service 11/01/2030 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 69 |
Lancaster, OH AEP-2024-OH031, AEP-2024-OH044 · s3955.1-6 |
Anchor Hocking Memorial Drive South Baltimore West Lancaster |
Status Engineering Cost $33.852 M In service 12/01/2028 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 72 |
Hanna, IN/Tanners Creek, IN AEP-2025-IM010 · s3956.1 |
Batesville Gwynneville Hanna Tanners Creek |
Status Scoping (Conceptual) Cost $520 M In service 10/15/2031 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 75 |
Kenova, WV AEP-2026-AP004 · s3957.1 |
Kenova | Status In Service Cost $0.6 M In service 05/22/2026 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 77 |
Addison - Lick, Addison - Haners Upgrades AEP-2022-OH067, AEP-2022-OH069 · s3958.1-8 |
Addison Chickamauga New Gavin Haners Lick North Proctorville Rio Sporn |
Status Scoping (Conceptual) Cost $165.726 M In service 10/08/2032 Load 20.6 MVA |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 86 |
Timken Mercy Rebuild AEP-2023-OH009 · s3959.1-3 |
Eighth Street Schroyer Avenue Stadium Park Timken Mercy |
Status Engineering Cost $7.195 M In service 05/04/2028 |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 90 |
Orrville, OH AMPT-2023-004 |
Apple Ave East Wooster Mineral Springs New Star-Cloverdale |
Status Engineering Cost $68.741M In service 8/30/2030 Load 60 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 93 |
Hannibal, WV AEP-2025-OH012 · s4021.1-2 |
Hannibal | Status Engineering Cost $1.875 M In service 10/26/2026 Load 570 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 95 |
Canton Central, OH AEP-2025-OH021 · s4022.1-5 |
Canton Central Tidd Triton New Wagenhals |
Status Engineering Cost $21.961 M In service 01/08/2028 Load 300MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 97 |
South Canton, OH/Torrey, OH AEP-2025-OH007 · s4023.1-5 |
Petros New South Canton Timken Richville Torrey |
Status Engineering Cost $49.124 M In service 10/13/2027 Load 255 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 99 |
Muskingum River, OH AEP-2025-OH013 · s4024.1-2 |
Muskingum | Status Conceptual Cost $5.782 M In service 12/06/2027 Load 200MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 101 |
Maliszewski Station Improvements AEP-2026-OH008 · s4025.1-4 |
Hyatt Maliszewski Polaris |
Status Scoping (Conceptual) Cost $12.57 M In service 09/15/2027 Load 25 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 105 |
Ormet, OH AEP-2024-OH040 · s4058.1-3 |
Hannibal Kammer Ormet Stetson Run New |
Status Scoping (Conceptual) Cost $8.59 M In service 06/01/2026 Load 266MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 107 |
New Albany, OH AEP-2023-OH068 · s4060.1 |
Anguin NBY-7 New NBY6 |
Status Engineering Cost $0.6 M In service 8/1/2025 Load 720 MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 109 |
South East Canton, OH AEP-2025-OH020 · s4061.1-4 |
South Canton Southeast Canton Sunnyside Timken Timken Richville Torrey Vettel New |
Status Engineering Cost $31.766 M In service 01/07/2028 Load 312MW |
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 111 |
Progress Park, VA AEP-2026-AP001 · s4062.1-2 |
Progress Park | Status Engineering Cost $11.759 M In service 02/08/2027 Load 240MW |
| 2026-10-06 | TEAC Informational Only - ACE Local Plan Submission of Supplemental Projects for 2026 p. 2 |
ACE-2025-001 | Beckett Churchtown |
Status Engineering Cost $16M In service Phase 1 – 4/28/2026, Phase 2 – 12/2029 Load 40 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 2 |
New Haven, Indiana AEP-2023-IM026 · s3750.1-4 |
Allen Zodiac New |
Status Scoping (Conceptual) Cost $169.1 M In service 07/01/2029 Load 1200MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 5 |
MISO Tranche 2 Projects AEP-2024-IM018 · s3608.1-7 |
Babcock Batesville Gwynneville New Madison County New Pike County New Sorenson Sullivan |
Status Scoping (Conceptual) Cost $0M (PJM) In service 2032-2034 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 8 |
New Carlisle, IN AEP-2024-IM016 · s3763.1 |
Dumont Navistar New New Prairie |
Status Scoping (Conceptual) Cost $50.364 M In service 03/15/2027 Load 437MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 10 |
New Carlisle Customer Needs AEP-2023-IM020 · s3764.1-2 |
Creek Walker Edison Fillmore Road New Olive |
Status Scoping (Conceptual) Cost $30.463 M In service 05/09/2028 Load 90 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 12 |
Dowagiac, MI AEP-2024-IM011 · s3765.1 |
Hassle Switch New Kenzie Creek Valley |
Status Engineering Cost $3.719 M In service 12/01/2025 Load 5.14 MVA |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 14 |
Pax Branch, WV AEP-2025-AP004 · s3825.1 |
Bradley Kanawha Pax Branch Sand Branch New |
Status Engineering Cost 0 In service 11/14/2025 Load 7.5 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 16 |
Pike County, KY AEP-2023-AP006 · s3826.1-3 |
Johns Creek Second Fork Simers New |
Status Engineering Cost $3.99 M In service 11/01/2025 Load 15 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 18 |
Trail Fork, WV AEP-2025-AP003 · s3827.1 |
Aloe Vera SW New Baileysville Logan Switchback Trail Fork |
Status Engineering Cost 0 In service 03/05/2026 Load 7MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 20 |
Elcona Tap, IN AEP-2025-IM003 · s3828.1-4 |
Dunlap East Elkhart Elcona Elcona Tap |
Status Scoping (Conceptual) Cost $18.128 M In service 05/02/2029 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 22 |
Harrison, OH/Madison, OH AEP-2025-OH001 · s3829.1-4 |
Erin Hills Switch New Harrison Madison |
Status Engineering Cost $11.015 M In service 06/08/2029 Load 17.5 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 24 |
Greif, OH/Huntley, OH/Busch, OH/Lazelle, OH AEP-2025-OH003 · s3830.1 |
Busch Greif Huntley Lazelle |
Status Engineering Cost $15.7 M In service 03/03/2028 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 26 |
Windsor, OH AEP-2025-OH004 · s3831.1-3 |
Carrollton Krone Switch New Sunnyside |
Status Scoping (Conceptual) Cost $2.455 M In service 02/18/2027 Load 20 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 28 |
Don Marquis, OH AEP-2026-OH004 · s3864.1-6 |
Don Marquis Monza New |
Status Scoping (Conceptual) Cost $156.6 M In service 12/31/2027 Load 800 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 30 |
East Leipsic, OH AEP-2025-OH011 · s3837.1 |
East Leipsic | Status Engineering Cost $10.624 M In service 11/01/2027 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 32 |
Hicksville, OH AEP-2022-OH028 · s3836.1-3 |
Lockwood Road Sowers |
Status Engineering Cost $36.008 M In service 04/26/2029 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 34 |
German, IN AEP-2025-IM002 · s3838.1-3 |
German Notre Dame Olive |
Status Scoping (Conceptual) Cost $2.672 M In service 09/29/2028 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 36 |
Forest3, OH/Upper Sandusky, OH AEP-2025-OH009 · s3840.1-3 |
Forest Helium Switch New Upper Sandusky |
Status Engineering Cost $4.901 M In service 07/01/2026 Load 13.5MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 38 |
East Tiffin, OH/Mousey Switch, OH AEP-2025-OH024 · s3842.1 |
East Tiffin Mousey Switch |
Status Engineering Cost $19.174 M In service 05/01/2027 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 40 |
Cleveland, IN AEP-2025-IM006 · s3839.1-4 |
Capital Avenue Cleveland East Elkhart |
Status Scoping (Conceptual) Cost $7.067 M In service 12/31/2030 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 42 |
Abert, VA AEP-2025-AP007 · s3841.1 |
Abert | Status Scoping (Conceptual) Cost $3.4 M In service 11/16/2029 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 44 |
Mount Vernon, Ohio AEP-2024-OH028 · s3884.1-3 |
Commerce Jennings Road Switch Sharp Road |
Status Scoping (Conceptual) Cost $2.575 M In service 08/04/2027 Load 12.031 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 46 |
S2888 Scope Change AEP-2022-IM008 · S2888 |
Adams Berne |
Cost $19.45M In service 2/13/2029 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 47 |
Haverhill, Ohio AEP-2022-OH002 · s3904.1 |
North Haverhill | Status Conceptual Cost $12.985 M In service 03/01/2027 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 49 |
Lazelle, OH/Bush, OH AEP-2025-OH002 · s3905.1 |
Busch Lazelle Sancus Switch New |
Status Engineering Cost $4.44 M In service 12/28/2027 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 51 |
s3440.3 Scope Change AEP-2022-OH071 · s3440.3 |
Beatty Bixby Canal Cyprus New Marion station Parsons Waverly |
Status Scoping (Conceptual) Cost $77.4M In service 06/05/2027 Load 675 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 53 |
Elkhart, IN AEP-2023-IM003, AEP-2023-IM005 · s3906.1-13 |
Conant Dunlap East Elkhart Elkhart Hydro Greenleaf Middlebury Tap Middleton Run SS Osolo Parkway Tap Wyland SS |
Status Scoping (Conceptual) Cost $20.647 M In service 09/01/2028 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 57 |
Bixby, OH/Beatty, OH AEP-2026-OH001 · s3907.1-3 |
Cyprus | Status Engineering Cost $5.218 M In service 09/01/2026 Load 675 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 59 |
Auglaize County, OH AEP-2022-OH022 · s3908.1 |
Kossuth West Moulton |
Status Engineering Cost $23.396 M In service 08/15/2029 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 61 |
Hannibal, OH AEP-2024-OH039 · s3762.1 |
Hannibal North Sub Station |
Status Scoping (Conceptual) Cost $0.392 M In service 07/17/2025 Load 200 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 63 |
Wayne County, WV AEP-2022-AP032 · s3952.1-3 |
East Lynn Lavalette Tri-State |
Status Scoping (Conceptual) Cost $98.8 M In service 11/28/2029 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 65 |
Illinois Road, IN/Gateway, IN AEP-2024-IM012 · s3953.1-2 |
Conrail SW New Gateway Illinois Rd |
Status Engineering Cost $55.628 M In service 08/15/2030 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 67 |
Thelma, KY/Big Sandy, KY/Busseyville, KY AEP-2025-AP006 · s3954.1-4 |
Big Sandy Busseyville Thelma |
Status Scoping (Conceptual) Cost $169.555 M In service 11/01/2030 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 69 |
Lancaster, OH AEP-2024-OH031, AEP-2024-OH044 · s3955.1-6 |
Anchor Hocking Memorial Drive South Baltimore West Lancaster |
Status Engineering Cost $33.852 M In service 12/01/2028 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 72 |
Hanna, IN/Tanners Creek, IN AEP-2025-IM010 · s3956.1 |
Batesville Gwynneville Hanna Junction Tower Tanners Creek |
Status Scoping (Conceptual) Cost $520 M In service 10/15/2031 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 75 |
Kenova, WV AEP-2026-AP004 · s3957.1 |
Kenova | Status In Service Cost $0.6 M In service 05/22/2026 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 77 |
Addison - Lick, Addison - Haners Upgrades AEP-2022-OH067, AEP-2022-OH069 · s3958.1-8 |
Addison Chickamauga New Gavin Haners Lick Rio Sporn |
Status Scoping (Conceptual) Cost $165.726 M In service 10/08/2032 Load 20.6 MVA |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 86 |
Timken Mercy Rebuild AEP-2023-OH009 · s3959.1-3 |
Schroyer Avenue Stadium Park Timken Mercy |
Status Engineering Cost $7.195 M In service 05/04/2028 |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 90 |
Orrville, OH AMPT-2023-004 |
Apple Ave East Wooster Mineral Springs New |
Status Engineering Cost $68.741M In service 8/30/2030 Load 60 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 93 |
Hannibal, WV AEP-2025-OH012 · s4021.1-2 |
Hannibal | Status Engineering Cost $1.875 M In service 10/26/2026 Load 570 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 95 |
Canton Central, OH AEP-2025-OH021 · s4022.1-5 |
Canton Central Triton New |
Status Engineering Cost $21.961 M In service 01/08/2028 Load 300MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 97 |
South Canton, OH/Torrey, OH AEP-2025-OH007 · s4023.1-5 |
Petros New South Canton Timken Richville Torrey |
Status Engineering Cost $49.124 M In service 10/13/2027 Load 255 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 99 |
Muskingum River, OH AEP-2025-OH013 · s4024.1-2 |
Muskingum River | Status Conceptual Cost $5.782 M In service 12/06/2027 Load 200MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 101 |
Maliszewski Station Improvements AEP-2026-OH008 · s4025.1-4 |
Hyatt Maliszewski Polaris |
Status Scoping (Conceptual) Cost $12.57 M In service 09/15/2027 Load 25 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 105 |
Ormet, OH AEP-2024-OH040 · s4058.1-3 |
Hannibal Kammer Ormet |
Status Scoping (Conceptual) Cost $8.59 M In service 06/01/2026 Load 266MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 107 |
New Albany, OH AEP-2023-OH068 · s4060.1 |
Anguin NBY-7 New NBY6 |
Status Engineering Cost $0.6 M In service 8/1/2025 Load 720 MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 109 |
South East Canton, OH AEP-2025-OH020 · s4061.1-4 |
South Canton Southeast Canton Sunnyside Timken Timken Richville Torrey Vettel New |
Status Engineering Cost $31.766 M In service 01/07/2028 Load 312MW |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 111 |
Progress Park, VA AEP-2026-AP001 · s4062.1-2 |
Progress Park | Status Engineering Cost $11.759 M In service 02/08/2027 Load 240MW |
| 2026-10-06 | TEAC Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 2 |
AMPT Projects in DAY Transmission Zone M3 Process Versailles, OH AMPT-2024-001 · s3734.1 (AMPT), s3734.2 (AMPT), s3734.3 (AMPT), s3734.4 (AMPT), s3734.5 (AMPT), s3734.6 (AMPT), s3734.7 (AES), s3734.8 (AES) |
Baker Road New Greenlawn McGreevey Road Station New Rossburg Russia Water Street Water Street Tap |
Status Engineering Cost $66.6 M In service 6/30/2028 Load 16 MW |
| 2026-10-06 | TEAC Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 5 |
AMPT Projects in ATSI Transmission Zone M3 Process Bowling Green, OH AMPT-2025-003 · s3767.1 (AMPT) |
Gypsy Lane | Status Pre-Engineering (Engineering) Cost $3.2M In service 10/30/2027 |
| 2026-10-06 | TEAC Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 7 |
AMPT Projects in AEP Transmission Zone M3 Process Orrville, OH AMPT-2023-004 · s3832.1 (AMPT), s3832.2 (ATSI), s3832.3 (AMPT), s3832.4 (AMPT), s3832.5 (AMPT), s3832.6 (AEP) |
Apple Ave Cloverdale East Wooster Mineral Springs New New FE switchyard New Power Plant Star |
Status Engineering Cost $68.741M In service 8/30/2030 Load 60 MW |
| 2026-10-06 | TEAC Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 10 |
AMPT Transmission Zone M3 Process Niles Central 138 kV substation AMPT-2025-005 · s3888.1 (AMPT) & s3888.2 (ATSI) |
McDonald Steel Niles Niles Central |
Status Pre-Engineering (Engineering) Cost $14.1M In service 08/01/2028 Load 63 MW |
| 2026-10-06 | TEAC Informational Only - AMPT Local Plan Submission of the Supplemental Projects for 2026 p. 12 |
AMPT Transmission Zone M3 Process Poe Road - Tontogany 69 kV line AMPT-2025-004 · s3889.1 (AMPT) & s3889.2 (ATSI) |
Poe Road Sand Ridge Tontogany |
Status Pre-Engineering (Engineering) Cost $6.136 M In service 11/30/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 2 |
New Customer Connection APS-2024-110 · s3755.1 |
Dutch Fork Windsor |
Status Conceptual Cost $5.8 M In service 08/14/2026 Load 20 MW |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 6 |
Leadsville – Loughs Lane 138 kV Misoperation Relays APS-2024-112 · s3770.1 |
Leadsville Substation Loughs Lane Substation |
Cost $2.30M In service 9/28/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 9 |
Weirton - Wylie Ridge 138 kV Misoperation Relays APS-2024-025 · s3771.1 |
Weirton Substation Wylie Ridge Substation |
Cost $4.50M In service 07/20/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 12 |
Rider – Weston 138 kV Line: Customer Connection APS-2025-011 · s3772.1 |
Rider Weston Substation |
Cost $0.92 M In service 4/29/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 14 |
Gore - Hampshire 138 kV Line APS-2024-029 · 3773.1 |
Gore Substation Hampshire Substation |
Cost $23.12M In service 12/29/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 16 |
Kammer Substation APS-2025-020 · s3776.1 |
502 Junction Substation Kammer Substation |
Cost $9.25 M In service 8/15/2030 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 18 |
Oak Mound Control Building and Breakers APS-2024-095 · s3777.1 |
Glen Falls Substation Oak Mound Substation Quiet Dell Substation |
Cost $13.35M In service 6/16/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 21 |
Misoperation Relays: Oak Mound - Quiet Dell 138 kV Line APS-2024-089 · s3778.1 |
Oak Mound Substation Quiet Dell Substation |
Cost $2.63M In service 6/16/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 24 |
Misoperation Relays: Armstrong - Kittanning 138 kV Line APS-2024-010 · s3865.1 |
Armstrong Substation Kittanning Substation |
Cost $3.44M In service 09/10/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 27 |
Misoperation Relays: Shepler Hill Junction (Charleroi - Mitchell - Yukon) 138 kV Line APS-2024-102 · s3866.1 |
Belmon Charleroi Mitchell Smithton Substation Yukon |
Cost $3.71M In service 10/31/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 31 |
Misoperation Relays: Cecil – Enlow 138 kV Line APS-2024-105 · s3867.1 |
Cecil Enlow |
Cost $4.0M In service 06/11/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 34 |
Price Hill Substation APS-2025-028 · s3868.1 |
Price Hill Substation | Cost $0.10M In service 04/03/2026 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 36 |
Eaglehead - Monocacy 230 kV Line APS-2025-003 · s3869.1 |
Eaglehead Substation Monocacy Substation |
Cost $3.88M In service 08/24/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 38 |
Wylie Ridge No. 3 345/138 kV Transformer APS-2024-079 · s3870.1 |
Wylie Ridge Substation | Cost $13.45M In service 12/13/2030 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 40 |
Carroll - Mount Airy 230 kV line APS-2023-058 · s3871.1 |
Carroll Mt. Airy |
Cost $50M In service 06/30/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 42 |
Elko No. 1 230/138 kV Transformer APS-2025-012 · s3874.1 |
Elko Substation | Cost $6.69M In service 06/01/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 44 |
Grand Point – Roxbury 138 kV APS-2024-028 · s3880.1 |
Grand Point Greene Substation Letterkenny Substation Roxbury Substation |
Cost $28.34M In service 06/15/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 47 |
Junction – Parr Run 138 kV APS-2024-096 · s3875.1 |
None named | Cost $35M In service 06/16/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 49 |
Page-Riverton 138 kV New Customer APS-2023-014 · s3127.1 |
Catlett Mountain New | Status Cancellation (Cancelled) Cost $16M In service 05/30/2025 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 51 |
Yukon No. 7 500/138 kV Transformer APS-2025-030 · s3885.1 |
Yukon | Cost $0.41M In service 12/31/2026 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 53 |
Loughs Lane - Pickens 138 kV Line APS-2025-016 · s3886.1 |
None named | Cost $1.05M In service 12/31/2026 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 55 |
Glenville - Weston 138 kV Line APS-2024-074 · s3887.1 |
Glenville Weston Substation |
Cost $89.52M In service 12/15/2030 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 58 |
Bethel Park, PA APS-2025-026 |
Bethel Park Substation | No figures printed |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 60 |
North Shenandoah – Page 138 kV Line APS-2024-085 · s3937.1 |
North Shenandoah Substation Page |
Cost $4.06M In service 06/01/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 62 |
Loughs Lane – Pickens 138 kV Line APS-2023-032 · s3938.1 |
Beverly Substation Durbin Substation Loughs Lane Substation Pickens |
Cost $182.84M In service 11/04/2032 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 65 |
Gordon – Nyswaner 138kV Line APS-2024-055 · s3939.1 |
Gordon Nyswaner |
Cost $30.12M In service 12/29/2028 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 68 |
Dutch Fork – Enon 138 kV Line APS-2023-033 · s3930.1 |
Dutch Fork Enon Substation |
Cost $41.70M In service 12/08/2029 |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 70 |
Misoperation Relay Projects APS-2024-101 |
None named | No figures printed |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 72 |
Rhodes Lane - Yukon 500 kV Line APS-2025-029 · s3931.1 |
Rhodes Lane Substation Yukon |
Cost $5.45M In service 05/12/2028 |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.