Substation Scout

Susquehanna T10

Named in 9 PJM planning documents for 7 projects, from November 6, 2024 to May 8, 2026.

Existingdescribed as
PPLzone
230 kV, 230kVkV as printed
10mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PPL Transmission Zone: Baseline
b3909.1
Not printed $22.2 M 3/30/2029 Not printed 2024-12-03
TEAC
PPL Transmission Zone: Baseline MAAC PPL Cluster
b4029.1
Not printed $565.4M 6/1/2030 Not printed 2025-12-08
TEAC
PPL-2024-0003 Not printed $197.55 M 06/01/2027 1,980 MW 2025-05-06
TEAC
Susquehanna, PA
PPL-2025-0003 · s3706
Not printed $19.4 M 05/30/2028 1,440 MW 2025-10-08
TEAC
Beach Haven, PA
PPL-2026-0003
Conceptual $81.2 M 05/30/2028 1,500 MW 2026-05-08
TEAC
PPL Transmission Zone: Baseline
2024-W1-935
Not printed Not printed 6/1/2029 Not printed 2024-11-06
TEAC
MAAC PPL Cluster
2025-W1-558
Not printed $565.4M 6/1/2030 Not printed 2025-11-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $196.55 M → $195.55 M Not reported Not reported
Cost estimate $195.55 M → $196.55 M 2026-10-06 Not reported
Cost estimate $197.55 M → $195.55 M 2025-05-06 2026-10-06
In-service date 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 → 06/01/2027 Not reported Not reported
In-service date 06/01/2027 → 6/1/2026: S3528.1, S3528.6, & S3528.11 6/1/2027: S3528.2, S3528.3, S3528.4, S3528.5, S3528.7, S3528.8, S3528.9, S3528.10 2026-10-06 Not reported
Status unknown (Development) → conceptual (Conceptual) 2025-05-06 2026-10-06
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN Not reported Not reported
Substations named HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN → GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN 2026-10-06 Not reported
Substations named GLEN BROOK; HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; SUSQUEHANNA T10; TOMHICKEN → HARWOOD; NESCOPECK; SUNBURY; SUSQUEHANNA; TOMHICKEN 2025-05-06 2026-10-06
In-service date 04/2026 → 05/30/2028 2025-04-01 2025-05-06
In-service date 5/2028 → 05/30/2028 2026-03-10 2026-05-08

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2024 RTEP p. 31
PPL-2024-0003 “Install a new BAAH bay at the Susquehanna T10 230kV yard”
230kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 33
Susquehanna, PA “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in both Bay #1 and #3 at Susquehanna T10 230kV Yard”
230kV
2026-05-08 TEAC
Item 06 - PPL Supplemental Projects p. 12
Beach Haven, PA “Bifurcate Glen Brook - Susquehanna T10 #1 & #2 230kV line”
230kV
2025-12-08 TEAC
Item 11 - Reliability Analysis Update p. 28
PPL Transmission Zone: Baseline MAAC PPL Cluster No role wording
230 kV
2025-11-04 TEAC
Item 14 - Reliability Analysis Update p. 54
MAAC PPL Cluster No role wording
230 kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 33
Susquehanna, PA “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in both Bay #1 and #3 at Susquehanna T10 230kV Yard”
230kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 12
PPL-2024-0003 “Install a new BAAH bay at the Susquehanna T10 230kV yard”
230kV
2025-05-06 TEAC
Item 07 - PPL Supplemental Projects p. 16
Susquehanna, PA “Install one new 230kV breaker, 230kV dead-end, and ancillary equipment in both Bay #1 and #3 at Susquehanna T10 230kV Yard”
230kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 49
PPL Transmission Zone: Baseline “Susquehanna T10 230 kV Station Reconfiguration”
230 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 51
PPL Transmission Zone: Baseline “Susquehanna T10 230 kV Station Reconfiguration”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this