Named in 8 PJM planning documents for 4 projects, from October 17, 2024 to October 6, 2026.

Existingdescribed as
PENELECzone
115 kV, 46 kVkV as printed
11mentions

Also printed as: Glory Substation

PJM interconnection queue

A PJM queue substation page has the same name: Glory (PA) — 2 queue requests filed, 1 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Glory – Nanty Glo – Spangler 46 kV Line
PN-2024-022 · s3981.1
Not printed $13.81M 06/30/2028 Not printed 2026-10-06
TEAC
Glory – Nanty Glo – Spangler 46 kV Switches
PN-2024-026
Conceptual $1.86 M 11/13/2026 Not printed 2025-02-13
SRRTEP Mid-Atlantic
East Pike - Glory 115 kV Line Rebuild
PN-2024-027 · s4019.1
Not printed $47.73M 12/19/2029 Not printed 2026-10-06
TEAC
Glory - Nanty Glo - Spangler 46 kV N Line Switches, PA
PN-2026-007
Not printed Not printed Not printed Not printed 2026-06-16
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BOBIK LANE; GLORY; MOSS CREEK; NANTY GLO; NICKTOWN; SPANGLER; STRONGSTOWN; TEAKETTLE → BOBIK LANE; GLORY; NANTY GLO; SPANGLER; STRONGSTOWN 2025-12-11 2026-10-06
Substations named GLORY; MOSS CREEK; NANTY GLO; NICKTOWN; SPANGLER; TEAKETTLE → NICKTOWN 2026-06-16 2026-09-17

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 23
Glory – Nanty Glo – Spangler 46 kV Line “At Glory Substation: Replace line relaying”
46 kV
2026-10-06 TEAC
Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 39
East Pike - Glory 115 kV Line Rebuild “At Glory Substation, adjust relay settings as necessary.”
115 kV
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 23
Glory – Nanty Glo – Spangler 46 kV Line “At Glory Substation: Replace line relaying”
2026-10-01* SRRTEP Mid-Atlantic
Penelec local plan submission for 2026 RTEP p. 39
East Pike - Glory 115 kV Line Rebuild “At Glory Substation, adjust relay settings as necessary”
2026-09-08* SRRTEP Mid-Atlantic
Penelec local plan submission for 2025 RTEP p. 17
Glory – Nanty Glo – Spangler 46 kV Switches No role wording
46 kV
2026-06-16 SRRTEP Mid-Atlantic
Item 04 - Penelec Supplemental Projects p. 11
East Pike - Glory 115 kV Line Rebuild “At Glory Substation, adjust relay settings as necessary.”
115 kV
2026-06-16 SRRTEP Mid-Atlantic
Item 04 - Penelec Supplemental Projects p. 5
Glory - Nanty Glo - Spangler 46 kV N Line Switches, PA No role wording
46 kV
2025-12-11 SRRTEP Mid-Atlantic
Item 10 - PENELEC Supplemental Projects p. 8
Glory – Nanty Glo – Spangler 46 kV Line “At Glory Substation: Replace line relaying”
46 kV
2025-02-13 SRRTEP Mid-Atlantic
Item 03 - Penelec Supplemental Projects p. 3
Glory – Nanty Glo – Spangler 46 kV Switches No role wording
46 kV
2024-11-14 SRRTEP Mid-Atlantic
Item 05 - PENELEC Supplemental Projects p. 4
East Pike - Glory 115 kV Line Rebuild No role wording
115 kV
2024-10-17 SRRTEP Mid-Atlantic
Item 06 - Penelec Supplemental Projects p. 3
Glory – Nanty Glo – Spangler 46 kV Switches No role wording
46 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.