Wescosville

Named in 8 PJM planning documents for 2 projects, from October 8, 2024 to October 6, 2026.

Existingdescribed as
PPLzone
138kV, 500-138kV, 500/138kVkV as printed
8mentions

Also printed as: Wescosville substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Wescosville, PA
PPL-2024-0014 · s3551
Conceptual $15.5 M 12/31/2026 Not printed 2025-10-08
TEAC
Orefield, PA
PPL-2025-0006
Conceptual $194 M 05/31/2028 1000 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $159 M → $194 M 2025-06-05 2025-11-04
In-service date 10/2026 → 05/30/2028 2025-05-06 2025-06-05
In-service date 05/30/2028 → 05/31/2028 2025-06-05 2025-11-04
Substations named ALBURTIS; ALLENTOWN; OREFIELD; SIEGFRIED; SUSQUEHANNA; WESCOSVILLE → ALLENTOWN; OREFIELD; SIEGFRIED; SUSQUEHANNA; WESCOSVILLE 2025-11-04 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2026 p. 17
Orefield, PA “Rebuild the 138kV yard at Wescosville in a BAAH configuration”
138kV
2026-09-17* SRRTEP Mid-Atlantic
PPL local plan submission for 2026 RTEP p. 17
Orefield, PA “Connect on-site spare 500-138kV Transformer at Wescosville substation”
500-138kV
2026-09-08* SRRTEP Mid-Atlantic
PPL local plan submission for 2025 RTEP p. 11
Wescosville, PA “replacement of the existing 500-138kV Wescosville Transformer 3”
500-138kV
2025-11-04 TEAC
Item 08 - PPL Supplemental Projects p. 4
Orefield, PA “Rebuild the 138kV yard at Wescosville”
500-138kV
2025-10-08 TEAC
Informational Only - PPL Local Plan Submission of the Supplemental Projects for 2025 p. 10
Wescosville, PA “The Wescosville substation 500/138kV Transformer 3 is about 45 years old and reaching the end of its useful service life.”
500/138kV
2025-06-05 TEAC
Item 05 - PPL Supplemental Projects p. 6
Orefield, PA “Connect on-site spare 500-138kV Transformer at Wescosville substation”
500-138kV
2024-11-06 TEAC
Item 08 - PPL Supplemental Projects p. 14
Wescosville, PA “in-kind replacement of the existing 500-138kV Wescosville Transformer 3”
500-138kV
2024-10-08 TEAC
Item 07 - PPL Supplemental Projects p. 6
Wescosville, PA No role wording
500/138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this