Substation Scout

Mount Airy

Named in 3 PJM planning documents for 3 projects, from October 8, 2024 to April 7, 2026.

Existingdescribed as
APSzone
230 kVkV as printed
5mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Damascus – Mount Airy 230 kV Misoperation Relays
APS-2023-026 · s3091.1
Not printed $ 2.2 M 12/22/2023 Not printed 2024-10-08
TEAC
Carroll 230/138 kV Transformer #4 and Misoperation Relays
APS-2023-034 and APS-2023-063 · s3189.1, s3190.1
Not printed $8.6M 12/31/2026 Not printed 2024-10-08
TEAC
Carroll - Mount Airy 230 kV line
APS-2023-058
Conceptual $50M 06/30/2029 Not printed 2026-04-07
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named CARROLL; MT AIRY → CARROLL; MOUNT AIRY; MT AIRY 2025-11-04 2026-04-07
Substations named CARROLL; MOUNT AIRY; MT AIRY → CARROLL; MT AIRY 2026-04-07 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 25
Damascus – Mount Airy 230 kV Misoperation Relays “Replace wave trap, disconnect switches, and limiting substation conductor at Mount Airy”
230 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 63
Carroll 230/138 kV Transformer #4 and Misoperation Relays No role wording
230 kV
2026-04-07 TEAC
Item 03 - APS Supplemental Projects p. 3
Carroll - Mount Airy 230 kV line No role wording
230 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 25
Damascus – Mount Airy 230 kV Misoperation Relays “Replace wave trap, disconnect switches, and limiting substation conductor at Mount Airy”
230 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 63
Carroll 230/138 kV Transformer #4 and Misoperation Relays No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this