Dutch Fork
Named in 5 PJM planning documents for 2 projects, from December 13, 2024 to October 6, 2026.
Existingdescribed as
APSzone
138 kVkV as printed
7mentions
Also printed as: Dutch Fork Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Dutch Fork – Enon 138 kV Line APS-2023-033 · s3930.1 |
Not printed | $41.70M | 12/08/2029 | Not printed | 2026-10-06 TEAC |
| New Customer Connection APS-2024-110 · s3755.1 |
Conceptual | $5.8 M | 08/14/2026 | 20 MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 1/15/2026 → 08/14/2026 | 2024-12-13 | 2025-04-11 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 3 |
New Customer Connection | “Adjust relay settings at Dutch Fork and Windsor substations” 138 kV |
| 2026-10-06 | TEAC Informational Only - APS Local Plan Submission of the Supplemental Projects for 2026 p. 69 |
Dutch Fork – Enon 138 kV Line | “At Dutch Fork Substation: Remove wave trap, replace circuit breaker, disconnect switches, substation conductor and relaying.” 138 kV |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 3 |
New Customer Connection | “Adjust relay settings at Dutch Fork and Windsor substations” |
| 2026-09-28* | SRRTEP Western APS local plan submission of the supplemental projects for 2026 RTEP p. 69 |
Dutch Fork – Enon 138 kV Line | “At Dutch Fork Substation: Remove wave trap” |
| 2026-06-17 | SRRTEP Western Item 03 - APS Supplemental Projects p. 18 |
Dutch Fork – Enon 138 kV Line | “At Dutch Fork Substation: Remove wave trap, replace circuit breaker” 138 kV |
| 2025-04-11 | SRRTEP Western Item 06 - APS Supplemental Project p. 13 |
New Customer Connection | “Adjust relay settings at Dutch Fork and Windsor substations” 138 kV |
| 2024-12-13 | SRRTEP Western Item 15 - APS Supplemental Project p. 3 |
New Customer Connection | No role wording 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.