Substation Scout

PVSC

Named in 4 PJM planning documents for 1 project, from October 8, 2024 to October 8, 2025.

Existingdescribed as
PSEGzone
—kV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Newark Bay Area
PSEG-2023-0005 · s3007.1
Engineering $25.6M 12/2025 Not printed 2025-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2024 RTEP p. 5
Newark Bay Area “Modify terminal equipment at PVSC and Bayonne stations”
2026-09-08* SRRTEP Mid-Atlantic
PSEG local plan submission for 2025 RTEP p. 3
Newark Bay Area “Modify terminal equipment at PVSC and Bayonne stations to accommodate the EP cables”
2025-10-08 TEAC
Informational Only - PSEG Local Plan Submission of the Supplemental Projects for 2025 p. 3
Newark Bay Area “Modify terminal equipment at PVSC and Bayonne stations to accommodate the EP cables”
2024-10-08 TEAC
Informational Only - PSEG Local Plan submission of supplemental project 2024 p. 5
Newark Bay Area “Modify terminal equipment at PVSC and Bayonne stations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this