Galion
Named in 4 PJM planning documents for 4 projects, from October 8, 2024 to October 8, 2025.
Existingdescribed as
ATSIzone
138 kVkV as printed
8mentions
Also printed as: Galion Substation
PJM interconnection queue
A PJM queue substation page has the same name: Galion (OH) — 4 queue requests filed, 3 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| ATSI Transmission Zone M-3 Process
Galion 138 kV Breakers ATSI-2023-036 · s3360.1 |
Not printed | $5.8M | 08/08/2025 | Not printed | 2024-10-08 TEAC |
| ATSI Transmission Zone M-3 Process
Galion – Roberts North 138 kV Line and Galion – Roberts South 138 kV Line ATSI-2024-024 · s3469.1 |
Not printed | $66.5 M | 8/27/2026 | Not printed | 2024-10-08 TEAC |
| Cardington (Galion) 138 kV Line Customer Connection ATSI-2024-040 · s3545.1 |
Not printed | $2.8 M | 12/31/2027 | Not printed | 2025-10-08 TEAC |
| ATSI Transmission Zone M-3 Process
Galion – Ontario 138 kV Line Customer Connection ATSI-2024-045 · s3525.1 |
Not printed | $1.04 M | 7/14/2025 | 63 MVA | 2024-10-08 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 105 |
ATSI Transmission Zone M-3 Process Galion – Ontario 138 kV Line Customer Connection | “Adjust relay settings at Galion and Ontario substations” 138 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 49 |
ATSI Transmission Zone M-3 Process Galion 138 kV Breakers | “At Galion: Replace 138 kV breakers B-52, B-55, B-58, B-59 and B-60” |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2024 RTEP p. 83 |
ATSI Transmission Zone M-3 Process Galion – Roberts North 138 kV Line and Galion – Roberts South 138 kV Line | “Galion
Replace circuit breakers and associated disconnect switches.” 138 kV |
| 2026-09-08* | SRRTEP Western ATSI local plan submission of the supplemental projects for 2025 RTEP p. 15 |
Cardington (Galion) 138 kV Line Customer Connection | “Adjust relay settings at Galion substations.” 138 kV |
| 2025-10-08 | TEAC Informational Only - ATSI Local Plan Submission of the Supplemental Projects for 2025 p. 15 |
Cardington (Galion) 138 kV Line Customer Connection | “Adjust relay settings at Galion substations.” 138 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 104 |
ATSI Transmission Zone M-3 Process Galion – Ontario 138 kV Line Customer Connection | “Adjust relay settings at Galion and Ontario substations” 138 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 49 |
ATSI Transmission Zone M-3 Process Galion 138 kV Breakers | “Replace 138 kV breakers B-52, B-55, B-58, B-59 and B-60 as well as circuit switchers CS-136 and CS-137.” 138 kV |
| 2024-10-08 | TEAC Informational Only - ATSI Local Plan submission of supplemental project 2024 p. 83 |
ATSI Transmission Zone M-3 Process Galion – Roberts North 138 kV Line and Galion – Roberts South 138 kV Line | “Replace circuit breakers and associated disconnect switches.” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.