Substation Scout

Hickory Plains

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
EKPCzone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Big Hill
EKPC-2023-010 · s3168.0
Engineering $0.0M 11/1/2025 Not printed 2024-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BIG HILL; HICKORY PLAINS → BIG HILL; FAWKES; HICKORY PLAINS; SAND GAP; THREE LINK; WEST BEREA 2024-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Western
EKPC local plan submission of the supplemental projects for 2024 RTEP p. 10
Big Hill No role wording
2024-10-08 TEAC
Informational Only - EKPC Local Plan Submission of the Supplemental Projects for 2024 p. 10
Big Hill “The Hickory Plains distribution substation currently serves the highest numbers of customers”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this