Shawville
Named in 5 PJM planning documents for 3 projects, from July 7, 2026 to October 6, 2026.
Existingdescribed as
PENELECzone
230 kV, 230/115-17 kVkV as printed
5mentions
Also printed as: Shawville substation · Shawville Substation
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Shawville and Lewistown 230 kV Terminal Upgrades PN-2023-022 · s3986.1 |
Not printed | $4.97M | 06/15/2028 | Not printed | 2026-10-06 TEAC |
| Shawville Bank 1A Transformer PN-2023-030 · s3334.1 |
Not printed | $8.8M | 06/05/2026 | Not printed | 2026-09-08* SRRTEP Mid-Atlantic |
| Shawville and Elko 230 kV Terminal Upgrades PN-2024-015 (Also refer to APS-2024-037) |
Conceptual | $1.14 M | 12/14/2029 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | DALE SUMMIT; LEWISTOWN; SHAWVILLE; SHINGLETOWN → LEWISTOWN; SHAWVILLE; SHINGLETOWN | 2026-10-06 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - Penelec Local Plan Submission of Supplemental Projects for 2026 p. 33 |
Shawville and Lewistown 230 kV Terminal Upgrades | “At Shawville Substation (PN-2023-022): Replace substation conductor and revise relay settings.” 230 kV |
| 2026-10-06 | TEAC Item 10 - Penelec Supplemental Projects - Presentation p. 3 |
Shawville and Elko 230 kV Terminal Upgrades | “Shawville and Elko 230 kV Terminal Upgrades” 230 kV |
| 2026-10-01* | SRRTEP Mid-Atlantic Penelec local plan submission for 2026 RTEP p. 33 |
Shawville and Lewistown 230 kV Terminal Upgrades | “At Shawville Substation (PN-2023-022): Replace substation conductor” |
| 2026-09-08* | SRRTEP Mid-Atlantic Penelec local plan submission for 2024 RTEP p. 20 |
Shawville Bank 1A Transformer | “Replace the existing Shawville 1A Transformer” 230/115-17 kV |
| 2026-07-07 | TEAC Item 09 - Penelec Supplemental Projects p. 3 |
Shawville and Lewistown 230 kV Terminal Upgrades | “Shawville and Lewistown 230 kV Terminal Upgrades” 230 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.