Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
| Date | Document | Project | Substations named | As printed |
|---|---|---|---|---|
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Genoa-Westar Rebuild | Genoa Westar |
Cost 8.789 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Genoa-Westar Sag Remediation | Genoa Westar |
Cost 2.815 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Jester - Hayden | Hayden Jester New |
Cost 229.411 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Maliszewski 765/345 kV Upgrades | Bokes Creek Corridor Hyatt Maliszewski Marysiville Marysville West Millersport |
Cost 145.494 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Maliszewski-Polaris Rebuild | Maliszewski Polaris |
Cost 8.884 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Maliszewski Series Reactor Upgrades | Maliszewski | Cost 2.328 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 32 |
New 345 kV line between Bayshore to Davis Besse to Lake Ave | Bay Shore Bayshore Davis Besse Lake Ave Lemoyne |
Cost 257.3 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 32 |
New 345 kV line between Bayshore to Davis Besse to Lake Ave New 345 kV line between Lemoyne to Lake Ave | Bay Shore Bayshore Davis Besse Lake Ave Lemoyne |
Cost 344.1 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 32 |
New 345 kV line between Lemoyne - Lake Ave | Lake Ave Lemoyne |
Cost 202.0 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 32 |
New 345 kV line between Lemoyne to Lake Ave | Lake Ave Lemoyne |
Cost 455.0 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 32 |
New double circuit 345 kV line between Fostoria Central and Lake Ave | Fostoria Central Lake Ave |
Cost 328.3 |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 32 |
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations | Avery Bayshore Beaver Davis Besse Greenfield Hayes Johnson Lakeview Ottawa Shinkrock |
Cost 265.1 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 3 |
AEP Transmission Zone: Baseline
B3295 Cancellation B3295 |
Big Rock Bull Creek Grundy Knotty Poplar Patrick Thomas |
Status Cancellation (Cancelled) Cost $0.8M In service 6/1/2025 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 5 |
ComEd Transmission Zone: Baseline Change No Load Taps at 6 stations | Crawford Elmhurst Fisk Skokie Taylor West Loop |
Cost $289 K In service 4/15/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 8 |
AEP Transmission Zone: Baseline
Cloverdale 138kV XT8 Circuit Switcher Replacement b3897.1 |
Cloverdale | Cost $1.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 10 |
AEP Transmission Zone: Baseline
Sunnyside 138kV BB CB Replacement b3882.1 |
Sunnyside | Cost $1.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 12 |
AEP Transmission Zone: Baseline
Greentown 138kV CS-XT5 Circuit Switcher Replacement b3887.1 |
Greentown | Cost $1.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 14 |
AEP Transmission Zone: Baseline
Jacksons Ferry 138kV L Circuit Switcher Replacement b3895.1 |
Jacksons Ferry | Cost $1.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 16 |
AEP Transmission Zone: Baseline
Hartford Transformer Tap Change Replacement b3872.1 |
Hartford Keelette Sister Lakes |
Cost $0.1M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 18 |
AEP Transmission Zone: Baseline
Benwood 69kV A CB Replacement b3886.1 |
Benwood | Cost $1.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 20 |
AEP Transmission Zone: Baseline
Van Wert 69kV D CB Replacement b3884.1 |
Van Wert | Cost $1.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 22 |
AEP Transmission Zone: Baseline
Mount Vernon 69kV A and S CB Replacements b3892.1 |
Mount Vernon | Cost $2.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 24 |
AEP Transmission Zone: Baseline
Schroyer Avenue 69kV M and N CB Replacements b3885.1 |
Schroyer Avenue | Cost $2.0M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 26 |
AEP Transmission Zone: Baseline
Greenleaf Cap Bank b3873.1 |
Conant Greenleaf Middlebury Middleton Run Parkway Wyland |
Cost $1.314M In service 6/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 28 |
AEP Transmission Zone: Baseline
Firebrick – Jefferson 69kV Reconductor b3875.1 |
Firebrick Jefferson Lick |
Cost $8.5M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 30 |
AEP Transmission Zone: Baseline
Richlands Cap 69kV Bank Installation b3876.1 |
Richlands Town of Richlands |
Cost $1.0M In service 12/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 32 |
AEP Transmission Zone: Baseline
Toronto – South Toronto Tap 69kV Reconductor b3879.1 |
South Toronto South Toronto Tap Toronto |
Cost $1.1M In service 6/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 34 |
AEP Transmission Zone: Baseline
Beatty 69kV Cap Bank b3880.1 |
Ballah SS Beatty Beatty Road Big Darby SS Clark Lakes Darbyville Deer Creek Dry Run SS Galloway Madison Texas Eastern |
Cost $2.25M In service 6/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 36 |
AEP Transmission Zone: Baseline
Haviland Station Upgrades b3883.1 |
Cavett Haviland North Van Wert |
Cost $0.8M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 38 |
AEP Transmission Zone: Baseline
East Leipsic – AE2-072 (Lammer) Sag Study and Mitigation b3888.1 |
East Leipsic Lammer |
Cost $2.5M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 40 |
AEP Transmission Zone: Baseline
Tiltonsville Upgrades b3889.1 |
Tiltonsville Windsor Windsor Junction |
Cost $0.8M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 42 |
AEP Transmission Zone: Baseline
South Coshocton Station Upgrades b3890.1 |
Ohio Central South Coshocton |
Cost $0.2M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 44 |
AEP Transmission Zone: Baseline
Kenny - Roberts 138kV Relay Upgrades b3891.1 |
Kenny Roberts |
Cost $0.4M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 46 |
AEP Transmission Zone: Baseline
Tidd Station Upgrades b3894.1 |
Carnegie Tidd |
Cost $0.5M In service 4/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 48 |
AEP Transmission Zone: Baseline
Skimmer Cap Bank Settings Adjustments b3896.1 |
Skimmer | Cost $0.1M In service 6/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 50 |
AEP Transmission Zone: Baseline
Buchanan – Keen Mountain Upgrades b3898.1 |
Buchanan Keen Mountain |
Cost $0.1M In service 12/1/2025 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 52 |
APS Transmission Zone: Baseline
2024 RTEP Window 1 b3870 |
Federal St Federal Street Springdale |
Cost $0.69 M In service 06/01/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 54 |
DLCO Transmission Zone: Baseline
2024 RTEP Window 1 b3871 |
Brunot Island | Cost $8.0 M In service 12/31/2028 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 56 |
ComEd Transmission Zone: Baseline
Kewanee 138kV L7411 (74 7411) CB Replacement b3903.1 |
Kewanee | Cost $1.101 M In service 6/1/2026 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 58 |
ComEd Transmission Zone: Baseline
Electric Junction to W541 Reconductor b3901.1 |
Electric Junction ESS W541 TSS 111 Electric Junction W541 |
Cost $1.657 M In service 6/1/2029 |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 60 |
ComEd Transmission Zone: Baseline
Kewanee Bus 1 b3900.1 |
Kewanee | Cost $0.204 M In service 4/15/2029 |
| 2024-11-15 | SRRTEP Western Item 02 - AMPT Supplemental Projects p. 3 |
Carriage, OH AMPT 2024-2 |
Bellevue Carriage Herbert |
Load 14 MW |
| 2024-11-15 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 3 |
Customer in Aurora ComEd-2024-022 |
None named | Load 91 MW |
| 2024-11-15 | SRRTEP Western Item 03 - ComEd Supplemental Projects p. 5 |
Customer in Aurora ComEd-2024-002 |
Aurora Electric Junction |
Status Engineering Cost $0M In service 12/31/26 Load 130 MW |
| 2024-11-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 3 |
Fisher Body, IN AEP-2024-IM003 |
Fisher Body Grant station |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 4 |
Putnam County, WV AEP-2024-AP005 |
Hurricane Teays |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 5 |
Ireland Road, IN AEP-2024-IM017 |
Ireland Road | In service 12/31/2028 |
| 2024-11-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 7 |
Franklin, OH AEP-2024-OH033 |
Bexley Drew station New St. Clair St. Clair Ave |
Status Scoping (Conceptual) Cost $10.793 M In service 11/30/2026 |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 3 |
Mitchell Plant Separation APS-2024-073 |
Charleroi Mitchell Yukon |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 4 |
Glen Falls – Fairview 138 kV Line APS-2024-088 |
Fairview Glen Falls Substation |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 6 |
Gordonsville – Pratts 115 kV Line APS-2024-092 |
Gordonsville Pratts |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 7 |
Belmont – Long Reach 138 kV Line APS-2024-093 |
Belmont Long Reach |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 9 |
Oak Mound Control Building and Breakers APS-2024-095 |
Glen Falls Substation Oak Mound Substation Quiet Dell Substation Rider Waldo Run |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 11 |
Junction – Parr Run 138 kV Line APS-2024-096 |
Junction Substation Parr Run |
No figures printed |
| 2024-11-15 | SRRTEP Western Item 05 - APS Supplemental projects p. 13 |
Stony Springs Junction Area APS-2023-022 |
Delmont Substation Harrison City Substation Hempfield Luxor North Greensburg Substation North Oakford Penn Stony Springs Junction |
Status Conceptual Cost $13.6M In service 6/22/2027 Load ~25 MW |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 3 |
The Reybold 138/69 kV transformer b3865.1 |
Delaware City Reybold Substation |
Cost $9.48 M In service 12/31/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 4 |
Yorkana and Windsor area b3858.1 |
Glades Substation Windsor Substation Yorkana 230 kV substation |
Cost $33.1 M In service 6/1/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 6 |
The Schuylkill 230/69 kV transformer b3863.1 |
Schuylkill Substation | Cost $0.1 M In service 12/31/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 7 |
Richmond - Tacony 69 kV b3864.1 |
Richmond Tacony |
Cost $0.350 M In service 6/1/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 8 |
Penhorn to Union City 69 kV b3868.1 |
Carlstadt Kingsland 69kV Switch Penhorn River Road Tonnelle Union City |
Cost $46 M In service 6/1/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 9 |
Bergen 138 kV series reactors b3869.1 |
Bergen East Rutherford Fairlawn |
Cost $12.5 M In service 9/1/2027 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 11 |
Chester 34.5kV Breaker b3860.1 |
Chester Substation | Cost $0.541M In service 12/31/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 12 |
Werner 34.5kV Breaker b3861.1 |
Werner Substation | Cost $0.541M In service 12/31/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 02 - UGI Supplemental Projects p. 3 |
UGI Transmission Zone: Supplemental Project UGI-2023-0001 |
Hanover Palooka Plymouth |
Status Engineering Cost $20M In service October 2026 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 3 |
Lofty, PA PPL-2024-0018 |
None named | In service 3/31/2026 Load 45MW |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 4 |
Beltway, PA PPL-2024-0019 |
None named | In service 5/31/2026 Load 50MW |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 03 - PPL Supplemental Projects p. 6 |
Middleburg, PA PPL-2019-0003 |
Beavertown Middleburg Sunbury |
Cost $33 M In service 05/31/2028 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 04 - MetEd Supplemental Projects p. 3 |
Frystown – South Lebanon 69 kV Line ME-2024-022 |
Frystown South Lebanon |
No figures printed |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 04 - MetEd Supplemental Projects p. 4 |
Muhlenberg – North Temple 69 kV Line ME-2024-023 |
Muhlenberg Substation North Temple Rosedale |
No figures printed |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 3 |
Cooper and Prospect Substation Terminal Upgrades PN-2024-032 |
Cooper Substation Prospect Substation |
No figures printed |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 4 |
East Pike – Glory 115 kV Line PN-2024-027 |
East Pike Glory |
No figures printed |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 05 - PENELEC Supplemental Projects p. 5 |
Blairsville East – Shelocta 115 kV Line PN-2024-029 |
Blairsville East Shelocta |
No figures printed |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects p. 3 |
Oceanview – Bradley Beach 34.5 kV D130 Line Customer Connection JCPL-2024-046 |
Bradley Beach Oceanview |
In service 07/03/2026 Load approximately 8.5 MVA |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects p. 5 |
Vernon No. 4 115-34.5 kV Transformer JCPL-2024-025 |
Vernon | Status Engineering Cost $7M In service 8/31/2029 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects p. 7 |
Deep Run No. 2 115-34.5 kV Transformer JCPL-2024-026 |
Deep Run Substation | Status Conceptual Cost $8M In service 12/31/2027 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects p. 9 |
Gilbert No. 2 and No. 3 115-34.5-13.2 kV Transformers JCPL-2024-027 |
Gilbert | Status Conceptual Cost $8M In service 12/31/2028 |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 06 - JCPL Supplemental Projects p. 11 |
Englishtown No. 1 115-34.5 kV Transformer JCPL-2024-028 |
Englishtown | Status Conceptual Cost $7M In service 12/31/2027 |
| 2024-11-14 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 3 |
DOM Transmission Zone: Baseline Merck #5 to Port Republic 115kV | Merck #5 substation Port Republic Substation |
Cost $42.3M In service 6/1/2029 |
| 2024-11-14 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 5 |
DOM Transmission Zone: Baseline Bremo 138/115kV Transformer #8 | None named | Cost $.092M In service 6/1/2029 |
| 2024-11-14 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 7 |
DOM Transmission Zone: Baseline Alta Vista 138/115kV Transformer #3 | None named | Cost $5M In service 6/1/2029 |
| 2024-11-14 | SRRTEP Southern Item 01 - SRRTEP South - Reliability Analysis Update p. 9 |
DOM Transmission Zone: Baseline Line #1031 Pantego to Terra 115kV | None named | Cost $26.6M In service 6/1/2029 |
| 2024-11-06 | TEAC Item 04 - APS Supplemental Projects p. 3 |
Wylie Ridge No. 3 345/138 kV Transformer APS-2024-079 |
Wylie Ridge Substation | No figures printed |
| 2024-11-06 | TEAC Item 04 - APS Supplemental Projects p. 4 |
Wylie Ridge No. 7 500/345 kV Transformer APS-2024-080 |
Wylie Ridge Substation | No figures printed |
| 2024-11-06 | TEAC Item 04 - APS Supplemental Projects p. 5 |
Lime Kiln – Montgomery 230 kV Line APS-2024-091 |
Lime Kiln Montgomery |
No figures printed |
| 2024-11-06 | TEAC Item 04 - APS Supplemental Projects p. 7 |
Monocacy No. 4 230/138 kV Transformer APS-2024-061 |
Monocacy Substation | Status Engineering Cost $9.00 M In service 12/31/2027 |
| 2024-11-06 | TEAC Item 05 - JCPL Supplemental Projects p. 3 |
Morris Park Substation JCPL-2023-011 |
Gilbert Martins Creek Morris Park Pequest River |
Status Conceptual Cost $15.4M In service 1/29/2027 Load 13 MW |
| 2024-11-06 | TEAC Item 06 - MetEd Supplemental Projects p. 3 |
North Hershey Substation ME-2023-022 |
North Hershey | Status Conceptual Cost $16.31M In service 12/17/2027 |
| 2024-11-06 | TEAC Item 07 - AEP Supplemental Projects p. 3 |
Fort Wayne, IN AEP-2024-IM014 |
Allen East Lima RP Mone Sorenson |
No figures printed |
| 2024-11-06 | TEAC Item 07 - AEP Supplemental Projects p. 5 |
New Carlisle, IN AEP-2024-IM016 |
None named | Load 437MW |
| 2024-11-06 | TEAC Item 07 - AEP Supplemental Projects p. 7 |
New Haven, Indiana AEP-2023-IM026 |
Allen Robison Park Zodiac New |
Status Scoping (Conceptual) Cost $169.1 M In service 07/01/2029 Load 1200MW |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 3 |
New Buffalo, PA PPL-2024-0017 |
None named | In service 05/2027 Load 1,000 MW |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 5 |
Lancaster, PA PPL-2024-0010 |
Engleside Greenland Lampeter New Millwood Pitney New Prince South Akron Strasburg |
Status Conceptual Cost $117.8 M In service 06/01/2028 Load 350 MW |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 7 |
Lancaster, PA PPL-2024-0011 |
Dillerville North Lancaster New Prince South Akron West Hempfield |
Status Conceptual Cost $67.5 M In service 06/01/2028 Load 350 MW |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 9 |
Hazleton, PA PPL-2024-0012 |
Harwood Slykerville New Susquehanna Tresckow |
Status Conceptual Cost $73.3 M In service 05/30/2028 Load 1,000 MW |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 11 |
Alburtis, PA PPL-2024-0013 |
Alburtis | Status Conceptual Cost $19.9 M In service 12/31/2026 |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 13 |
Wescosville, PA PPL-2024-0014 |
Wescosville | Status Conceptual Cost $15.5 M In service 12/31/2026 |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 15 |
Lackawanna, PA PPL-2024-0015 |
Lackawanna | Status Conceptual Cost $6.3 M In service 12/31/2026 |
| 2024-11-06 | TEAC Item 08 - PPL Supplemental Projects p. 17 |
New Buffalo, PA PPL-2024-0016 |
Blooming Grove | Status Conceptual Cost $6.3 M In service 12/31/2027 |
| 2024-11-06 | TEAC Item 09 - PECO Supplemental Projects p. 3 |
PE-2024-007 | None named | No figures printed |
| 2024-11-06 | TEAC Item 09 - PECO Supplemental Projects p. 4 |
New Business Customer PE-2024-008 |
None named | Load 600MW |
| 2024-11-06 | TEAC Item 10 - PEPCO Supplemental Projects p. 3 |
Mt. Zion PEP-2024-003 |
Mt. Zion Substation | No figures printed |
| 2024-11-06 | TEAC Item 11 - ComEd Supplemental Projects p. 3 |
Burnham 345kV BT1-2 CB ComEd-2024-018 |
Burnham Sheffield |
Status Engineering Cost $2.1M In service 12/31/24 |
| 2024-11-06 | TEAC Item 11 - ComEd Supplemental Projects p. 5 |
Burnham 345kV BT2-13 CB ComEd-2024-019 |
Bloom Burnham |
Status Engineering Cost $2.1M In service 12/31/25 |
| 2024-11-06 | TEAC Item 11 - ComEd Supplemental Projects p. 7 |
Burnham 345kV BT12-13 CB ComEd-2024-020 |
Burnham Davis Creek State Line |
Status Engineering Cost $2.1M In service 12/31/26 |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 3 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0075 |
Ocean Court | In service 10/1/2028 Load 300 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 4 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0076 |
Global Plaza | In service 1/1/2027 Load 295 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 5 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0077 |
Prentice Drive | In service 2/28/2026 Load 247.2 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 6 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0078 |
Export New | In service 1/1/2028 Load in excess of 100 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 7 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0079 |
Executive New | In service 2/1/2028 Load in excess of 100 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 8 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0080 |
Rock Bottom New | In service 3/31/2029 Load in excess of 100 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 9 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0081 |
Meteor New | In service 1/1/2027 Load 239 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 10 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0082 |
Chandler Sub New | In service 10/15/2027 Load 112 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 11 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0083 |
McDevitt New | In service 10/15/2027 Load 118 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 12 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0084 |
Mt. Pony Sub New | In service 01/01/2027 Load 160 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 13 |
Dominion Transmission Zone: Supplemental Customer Load Request DOM-2024-0085 |
Palomino Sub New | In service 07/01/2028 Load 120 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 15 |
Dominion Transmission Zone: Supplemental Park Center 230kV Delivery - DEV DOM-2020-0043- UPDATE |
Dulles Lincoln Park Park Center New Reston |
Status Engineering Cost $27.0 M In service 11/21/2025 Load 41.0 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 17 |
Dominion Transmission Zone: Supplemental Towerview 230kV Delivery - DEV DOM-2023-0004 |
Park Center Reston Towerview New |
Status Engineering Cost $13.0 M In service 11/30/2027 Load 300.0 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 19 |
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency DOM-2022-0058 |
Churchland Navy North Navy South Sewells Point |
Status Cancelled |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 20 |
Dominion Transmission Zone: Supplemental NIT Substation 230kV Delivery - DEV DOM-2023-0006 |
Churchland NIT New Sewells Point |
Status Construction (Under construction) Cost $5.7 M In service 12/31/2024 Load 49.3 MW |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 22 |
Dominion Transmission Zone: Supplemental Do No Harm Analysis DOM-2023-0006-DNH |
Navy North NIT Sewells Point South |
Status Engineering Cost $3 M In service 3/31/2026 |
| 2024-11-06 | TEAC Item 12 - Dominion Supplemental Projects p. 24 |
Dominion Transmission Zone: Supplemental Lost City 230kV Delivery - DEV DOM-2024-0041 |
Lost City | Status Engineering Cost $0.5M In service 06/01/2026 Load 187.0 MW |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 18 |
Conastone 230 kV 2322 B5 CB Replacement b3857 |
Conastone | Cost $1.921M In service 6/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 21 |
Beatty – Adkins 345kV Station Upgrades | Adkins Beatty Chenoweth |
Cost $5M In service 4/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 23 |
Canal – Gay St. 138kV Rebuild 2024-W1-940 |
Canal Gay |
Cost $15.595 M In service 12/31/2027 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 25 |
Cluster AEP-2 2024-W1-856 |
Bixby Buckeye Steel Canal Marion Road Mound St |
Cost $31.090 M In service 12/31/2028 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 28 |
Cluster AEP-6 2024-W1-769 |
Beatty Road Cyprus McComb White Road |
Cost $33.113 M In service 4/30/2028 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 31 |
Wilton Center BT 4-5 CB | Wilton Center | Cost $2.7 M In service 12/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 33 |
Cluster 1 2024-W1-135 |
Dresden Mulberry Pontiac |
Cost $16.27 M In service 6/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 36 |
Cluster 2 ComEd-2024-004 |
Busse Des Plaines Itasca |
Cost $14.31 M In service 6/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 39 |
Delco Tap – Mickleton Facility Upgrades | Delco Tap Mickleton |
Cost $1.03M In service 06/01/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 40 |
Milford and Cedar Creek Facility Upgrades | Cedar Creek Milford |
Cost $0.200M In service 12/31/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 41 |
Elroy – Hosensack Facility Upgrades | Elroy Hosensack |
Cost $1.5M In service 06/01/2029: |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 42 |
BGE Local N-1-1 | Chestnut Hill Frederick Rd. Graceton Howard Marley Neck New North East Pumphrey Wagner |
No figures printed |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 45 |
PECO Transmission Zone: Baseline 2024-W1-12 |
Eagle Point Master North Philadelphia Penrose Richmond Waneeta |
Cost $43.22 M In service 6/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 48 |
Pocono area Evaluation Progress | Acahela Jenkins Lackawanna Pocono Siegfried |
Cost $4.93 In service 10/30/2027 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 50 |
PPL Transmission Zone: Baseline 2024-W1-935 |
Cumberland Glen Brook Glenbrook Hunterstown Juniata Susquehanna Susquehanna T10 Three Mile Island Williams Grove |
In service 6/1/2029 |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 54 |
Clusters AEP- 3, 4, 5 (Shortlist) | Genoa Hayden Hyatt Jester New Maliszewski Marysville Polaris Vassell West Millersport Westar |
No figures printed |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 57 |
Cluster 2 (ATSI) | Avery Bay Shore Bayshore Beaver Davis Besse Fostoria Central Greenfield Hayes Johnson Lake Ave Lake Avenue Lakeview Lemoyne Ottawa Shinkrock |
No figures printed |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Latest · October 2026 (547) · September 2026 (830) · August 2026 (58) · July 2026 (80) · June 2026 (64) · May 2026 (90) · April 2026 (85) · March 2026 (71) · February 2026 (74) · January 2026 (69) · December 2025 (82) · November 2025 (156) · October 2025 (355) · September 2025 (219) · August 2025 (33) · July 2025 (40) · June 2025 (34) · May 2025 (41) · April 2025 (50) · March 2025 (56) · February 2025 (63) · January 2025 (42) · December 2024 (89) · November 2024 (138) · October 2024 (496)
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.