Substation Scout

Opequon

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to October 16, 2026.

Existingdescribed as
APSzone
138 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Misoperation Relay Projects
APS-2024-062 to APS-2024-068
Not printed Not printed Not printed Not printed 2024-10-08
TEAC
Misoperation Relays
APS-2026-051
Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Western
Item 01 - APS Supplemental Projects Presentation p. 9
Misoperation Relays No role wording
138 kV
2026-09-08* SRRTEP Western
APS local plan submission of the supplemental projects for 2024 RTEP p. 132
Misoperation Relay Projects “replace circuit breaker, disconnect switches, substation conductor and relaying”
138 kV
2024-10-08 TEAC
Informational Only - APS Local Plan submission of supplemental project 2024 p. 132
Misoperation Relay Projects “At Opequon, replace circuit breaker, disconnect switches, substation conductor and relaying”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this