Flint

Named in 2 PJM planning documents for 1 project, on October 8, 2024.

Existingdescribed as
PECOzone
230 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
220-47 Plymouth Meeting – Flint 230 kV Line Rebuild
PE-2023-009 · s3185.1
Engineering $18.2M 12/31/25 Not printed 2024-10-08
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
PECO local plan submission for 2024 RTEP p. 3
220-47 Plymouth Meeting – Flint 230 kV Line Rebuild “Replace various substation equipment at Plymouth Meeting and Flint substations”
230 kV
2024-10-08 TEAC
Informational Only - PECO Local Plan submission of supplemental project 2024 p. 2
220-47 Plymouth Meeting – Flint 230 kV Line Rebuild “Replace various substation equipment at Plymouth Meeting and Flint substations”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.