Vernon

Named in 5 PJM planning documents for 5 projects, from October 8, 2024 to October 8, 2025.

Existingdescribed as
JCPLzone
115 kV, 115-34.5 kVkV as printed
9mentions

Also printed as: Vernon Substation

PJM interconnection queue

A PJM queue substation page has the same name: Vernon (NJ) — 4 queue requests filed, 0 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
West Wharton – Sugarloaf 115 kV Lines
JCPL-2023-002 · s3421.1
Not printed $0.05M 7/25/2023 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
Franklin Substation
JCPL-2023-006, JCPL-2023-042 · s3299.1, s3299.2, s3299.3, s3299.4, s3252.1
Not printed $32.0 M 12/31/2025 67 MW 2024-10-08
TEAC
Vernon Substation
JCPL-2023-038 · s3249.1
Not printed $4.7 M 12/15/2025 Not printed 2024-10-08
TEAC
Misoperation Relay Projects
JCPL-2024-010 · s3328.1
Not printed $13.82 M 04/04/2025 Not printed 2026-09-08*
SRRTEP Mid-Atlantic
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer
JCPL-2024-025 · s3612.1
Not printed $7M 8/31/2029 Not printed 2025-10-08
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named FRANKLIN; VERNON; WEST WHARTON SUBSTATIONS → FRANKLIN; VERNON; WEST WHARTON 2024-10-08 Not reported
Substations named VERNON → FRANKLIN; VERNON; WEST WHARTON 2025-10-08 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2025 RTEP p. 17
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer “Replace the No. 4 115-34.5 kV Transformer at Vernon Substation”
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 17
Vernon Substation “Replace the 115-34.5 kV No. 1 Transformer at Vernon Substation”
115-34.5 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 20
Franklin Substation “Replace relaying at Franklin, Vernon, and West Wharton Substations”
115 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 70
Misoperation Relay Projects No role wording
115 kV
2026-09-08* SRRTEP Mid-Atlantic
JCPL local plan submission for 2024 RTEP p. 98
West Wharton – Sugarloaf 115 kV Lines No role wording
115 kV
2025-10-08 TEAC
Informational Only - JCPL Local Plan Submission of the Supplemental Projects for 2025 p. 17
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer “Replace the No. 4 115-34.5 kV Transformer at Vernon Substation”
115-34.5 kV
2024-11-14 SRRTEP Mid-Atlantic
Item 06 - JCPL Supplemental Projects p. 5
JCPL Transmission Zone M-3 Process Vernon No. 4 115-34.5 kV Transformer “Replace the No. 4 115-34.5 kV Transformer at Vernon Substation”
115-34.5 kV
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 17
Vernon Substation “Replace the 115-34.5 kV No. 1 Transformer at Vernon Substation”
2024-10-08 TEAC
Informational Only - JCPL Local Plan submission of supplemental project 2024 p. 20
Franklin Substation “Replace relaying at Franklin, Vernon, and West Wharton Substations”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.