Named in 5 PJM planning documents for 1 project, from April 1, 2025 to October 6, 2026.

Existingdescribed as
DAYTONzone
345kVkV as printed
5mentions

Also printed as: Atlanta Substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Dayton Transmission Zone M-3 Process
Dayton-2025-001, Dayton-2025-002 · s3898.1 – .9
Engineering $589.8 M 01/2031 1.5 GW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$480 M → $589.8 M 2026-07-07 2026-07-07
Cost estimate $480 M → $589.8 M 2025-05-06 2026-07-07
In-service date 1/2031 → 01/2031 2025-02-04 2025-04-01
Status conceptual (Conceptual) → engineering (Engineering) 2025-05-06 2026-07-07
Substations named ATLANTA; CLINTON; FAYETTE → ATLANTA; CLAY; CLINTON; FAYETTE; GREENE 2026-10-06 Not reported

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - Dayton Local Plan Submission of the supplemental projects for 2026 p. 12
Dayton Transmission Zone M-3 Process “Reconfigure the Atlanta 345kV substation”
345kV
2026-09-30* SRRTEP Western
Datyon local plan submission of the supplemental projects for 2026 RTEP p. 12
Dayton Transmission Zone M-3 Process “Reconfigure the Atlanta 345kV substation into a breaker-and-a-half arrangement”
345kV
2026-07-07 TEAC
item 11 - Dayton Supplemental Projects p. 5
Dayton Transmission Zone M-3 Process “Reconfigure the Atlanta 345kV substation into a breaker-and-a-half arrangement”
345kV
2025-05-06 TEAC
Item 05 - Dayton Supplemental Projects p. 5
Dayton Transmission Zone M-3 Process “Reconfigure the Atlanta 345kV substation into a breaker-and-a-half arrangement”
345kV
2025-04-01 TEAC
Item 06 - Dayton Supplemental Projects p. 5
Dayton Transmission Zone M-3 Process “Reconfigure the Atlanta 345kV substation into a breaker-and-a-half arrangement”
345kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.